The Wage and Hour Division (WHD) sets Davis-Bacon rates mostly from voluntary wage surveys of construction projects, county by county and by type of construction. A rate paid to a majority of workers in a classification prevails; if there is none, a rate paid to at least 30 percent; if there is none of those, a weighted average. The rates are published as wage determinations on SAM.gov, and contractors must pay at least those rates.

Updated November 21, 2026Sources 40 U.S.C. 3142(b); 29 CFR 1.2, 1.3, 1.6(c), 1.7 and 1.8; DOL Prevailing Wage Resource Book (Davis-Bacon Surveys); Fact Sheet 81

What the law requires

The Davis-Bacon Act does not set dollar figures. It says the minimum wages on a covered contract “shall be based on the wages the Secretary of Labor determines to be prevailing for the corresponding classes of laborers and mechanics employed on projects of a character similar to the contract work” in the civil subdivision where the work is done (40 U.S.C. 3142(b))40 U.S.C. 3142United States Code, Cornell LII. WHD does that work for the Secretary under 29 CFR part 129 CFR part 1Code of Federal Regulations, eCFR, and the answer is a wage determination: a list of classifications with a basic hourly rate and a fringe benefit rate for each, for one area and one or more types of construction.

Three ideas from the statute shape everything below. Rates are set by classification (carpenter, electrician, laborer), by type of construction (building, residential, highway, heavy; see the four construction types), and by area, which is normally a county.

The three-step test

29 CFR 1.2 defines the prevailing wage in three steps, applied to the survey data for one classification:

  1. Majority. The wage paid to more than 50 percent of the workers in the classification on similar projects in the area.
  2. 30 percent. If no single wage is paid to a majority, “the wage paid to the greatest number, provided that such greatest number constitutes at least 30 percent of those employed”.
  3. Weighted average. If no wage is paid to 30 percent or more, the average of the wages paid, weighted by the number of workers at each wage.

The 2023 Davis-Bacon rule put the middle step back. Before it, a rate had to be paid to a majority or the average was used. The rule's preamble says DOL returned to the three-step method in effect before 1983, “Under that method (also known as the 30-percent rule)”, and that the new method applies only to wage determination revisions completed on or after October 23, 2023. Older rates on a wage determination were set under the earlier method until they are revised. See the 2023 rule and what is in force in 2026.

Here is how the test plays out on made-up survey data for one classification (the numbers are an illustration, not real rates):

Survey result for 20 workersStep that decidesPrevailing rate
12 paid $40.00, 8 paid other ratesMajority (12 of 20 is over 50%)$40.00
7 paid $40.00, 5 paid $36.00, 8 paid other rates30 percent (7 of 20 is 35%)$40.00
No rate paid to 6 or more workersWeighted averageAverage of all 20 rates, weighted by headcount

Fringe benefits are worked out the same way, after the basic rate. DOL's surveys page says WHD first asks whether a majority of workers in the classification receive any fringe benefits at all. If not, no fringe benefit is listed for that classification. If they do, the majority, 30 percent and weighted average steps are applied to the fringe amounts of the workers who receive them.

A wage that a union or contractor pays at slightly different rates can still count as one rate: under 29 CFR 1.3(e)29 CFR 1.3Code of Federal Regulations, eCFR, WHD may treat variable rates as the same wage when they are functionally equivalent, as explained by a collective bargaining agreement or a contractor's written policy.

How a wage survey works

WHD's Branch of Wage Surveys runs the surveys. Fact Sheet 81 lists the steps:

  1. Set the survey parameters: the geographic scope, the type of construction and the time frame.
  2. Build a project list from Dodge Reports of active projects in the area (construction type, duration, prime contractor and value).
  3. Hold pre-survey briefings for contractors and other interested parties, including how to fill in Form WD-10.
  4. Notify every contractor on the project list, plus unions, contractor associations and congressional delegations.
  5. Collect and analyze the WD-10 data, following up on non-responses and unclear entries.
  6. Send the results to the Branch of Construction Wage Determinations for final review and publication on SAM.gov.

The Resource Book gives the time frame: “WHD generally provides interested parties with a period of three (3) months to submit data for a survey, and follow-up analysis and clarification can take 12-18 months after the survey cut-off date.” Data from private projects counts, not only federal ones, and Fact Sheet 81 is plain about one worry contractors raise: “WHD does not use data submitted during the course of a survey for purposes of enforcement.” WD-10 forms are kept confidential to the extent the law allows.

If your rates are not on the wage determination, the survey probably did not hear from you. In DOL's words, the wage determinations “can only reflect the data that is actually submitted”. Survey status and the WD-10 form are on DOL's construction surveys page.

What data counts

Under 29 CFR 1.3(b)29 CFR 1.3Code of Federal Regulations, eCFR, WHD may consider project wage statements (contractor, location, cost, dates, type, workers and rates per classification), signed collective bargaining agreements, rates set by state and local officials under their own prevailing wage laws, wage data that agencies send with conformance requests, and any other pertinent information. For Federal-aid highway projects, 23 U.S.C. 11323 U.S.C. 113United States Code, Cornell LII requires DOL to consult the state highway department and give due regard to its information.

One rule separates the construction types. For building and residential wage determinations, WHD “will not use data from Federal or federally assisted projects subject to Davis-Bacon prevailing wage requirements unless it is determined that there is insufficient wage data” without it. For heavy and highway wage determinations, data from federal and federally assisted projects is used. That is why agencies are sometimes asked for certified payroll data during heavy and highway surveys: the Resource Book says it can be essential for those types.

The area behind a rate

29 CFR 1.729 CFR 1.7Code of Federal Regulations, eCFR sets the order WHD follows when a county lacks enough data:

StepData WHD may use (29 CFR 1.7)29 CFR 1.7Code of Federal Regulations, eCFR
1Current projects in the county (projects under construction up to 1 year before the survey or request)
2Similar construction in surrounding counties
3Comparable counties or groups of counties in the state, and if necessary statewide data
4If statewide data is still short, projects completed more than 1 year earlier

DOL's surveys page adds that a rate for a particular classification can be based on a wider area than the county when there is not enough county data for that classification. Rates are published only when the data passes WHD's sufficiency tests, both for each classification and for the wage determination as a whole.

Other ways a rate reaches a wage determination

Not every rate on a wage determination comes straight from a recent survey. The identifier printed above each block of rates tells you which route it took (see how to read a wage determination):

RouteRuleIdentifier you will see
Union rate found prevailing in a survey, then updated as the collective bargaining agreement changes29 CFR 1.229 CFR 1.2Code of Federal Regulations, eCFR, 1.3(b)(2)Union code, such as PLUM0005-001
Weighted average of union rates when no single union rate prevailed29 CFR 1.229 CFR 1.2Code of Federal Regulations, eCFRUAVG
Single non-union rate or weighted average from the survey29 CFR 1.229 CFR 1.2Code of Federal Regulations, eCFRSU
Rates for frequently conformed classifications with too little survey data29 CFR 1.3(f)29 CFR 1.3Code of Federal Regulations, eCFRSC plus state
Rates adopted from a state or local prevailing wage system that meets four tests29 CFR 1.3(g)29 CFR 1.3Code of Federal Regulations, eCFR to (j)SA plus state

Non-union survey rates can also be brought up to date between surveys. Under 29 CFR 1.6(c)(1)29 CFR 1.6Code of Federal Regulations, eCFR, WHD may adjust non-collectively bargained rates on general wage determinations using the Bureau of Labor Statistics Employment Cost Index, “no more frequently than once every 3 years, and no sooner than 3 years after the date of the rate's publication”.

Union rates depend on updates reaching WHD. On February 19, 2026, a SAM.gov announcement said that updating collectively bargained rates on Davis-Bacon wage determinations was delayed. A union rate on SAM.gov can therefore lag the current agreement. The wage determination in your contract sets the Davis-Bacon minimum.

Why a classification is missing

DOL's surveys page answers this directly: “If a classification does not appear on a WD, it is because insufficient information was received for that classification during the survey process.” The fix on a live contract is a conformance request, which adds the classification and a rate that bears a reasonable relationship to the listed rates. See conformance: adding a missing job classification.

Challenging a rate

Any interested party may ask WHD to reconsider a wage determination under 29 CFR 1.829 CFR 1.8Code of Federal Regulations, eCFR. The request goes in writing, with a full statement of your views and any supporting wage data, by email to dba.reconsideration@dol.gov or by mail to the Administrator. The Administrator responds within 30 days or says more time is needed. If a staff-level decision is the one you disagree with, you can ask the Administrator to reconsider it within 30 days of the decision. After the Administrator denies reconsideration, you can petition the Administrative Review Board (29 CFR 1.929 CFR 1.9Code of Federal Regulations, eCFR and part 7). Survey questions, including requests for a summary of a survey, start with the Branch of Wage Surveys.

Timing matters. The Resource Book's summaries of appeals board cases say a challenge to the rates in a wage determination must come before contract award (or before construction starts if there is no award). After award, the rates in your contract are what you pay.

Questions filers ask

Does the Davis-Bacon rate equal the union rate?

Only where the union rate was found to prevail. Where it did not, the wage determination shows a survey (SU) rate or a union average (UAVG) rate instead. The identifier above each block of rates tells you which.

How often are Davis-Bacon rates updated?

Union rates are updated as WHD receives changes to the collective bargaining agreements. Survey rates usually stay until a new survey, though WHD may adjust non-union rates by the Employment Cost Index no more than once every 3 years. Changes are published as modifications to the wage determination on SAM.gov.

Will DOL use my survey data against me?

Fact Sheet 81 says WHD does not use data submitted during a survey for enforcement, and WD-10 forms are kept confidential to the extent the law allows.

Why are the building rates in my county lower than the heavy rates?

Each type of construction is surveyed and set separately, and the data rules differ: building and residential surveys generally exclude Davis-Bacon project data, while heavy and highway surveys include it. Different data produce different rates.

Can I ask DOL to change a rate on my contract?

You can ask for reconsideration under 29 CFR 1.829 CFR 1.8Code of Federal Regulations, eCFR, but the appeals board cases summarized in DOL's Resource Book say a challenge to wage determination rates must be made before contract award.