Most clean energy credits have a small base amount and an increased amount five times larger. You earn the increase by paying prevailing wages and using registered apprentices, or by fitting one of two exceptions: a facility under 1 megawatt, or construction that began before January 29, 2023. This page is general information, not tax advice.

Updated November 21, 2026Sources IRC 45(b)(6) to (8) and the parallel sections; Treas. Reg. 1.45-6, 1.45-7(a)(2), 1.45-8(a)(2), 1.48-13; T.D. 9998

How the 5x works

Section 45 is the model the other credits copy. Section 45(b)(6)(A) multiplies the credit for a qualifying facility by 5. A facility qualifies under 45(b)(6)(B) in one of three ways: it is small, it started early, or it meets the wage and apprentice rules. Treas. Reg. 1.45-6(b)Treas. Reg. 1.45-6Treasury regulations, eCFR repeats the three tests and adds the record and reporting rules of 1.45-12 to the third. The IRS lists the credits with the full PWA test (30C, 45, 45Y, 45Q, 45V, 45Z, 48, 48E, 48C and 179D) and two with only the prevailing wage half (45L and 45U) on its PWA page. This page is general information, not tax advice.

Base and increased amounts by credit

Amounts below come from the Code and, where noted, the IRS 2026 notices. Inflation adjustments change several of them each year.

CreditBase amountWith PWA (or an exception)
45 production credit2026: 0.6 cents per kWh (wind, solar, geothermal, closed-loop biomass; in service after 2021)5 times the base
45Y clean electricity production2026: 0.6 cents per kWh2026: 3.1 cents per kWh
48 and 48E investment credits6 percent30 percent
45Q carbon capture$17 per metric ton ($36 for direct air capture), tax years beginning 2025 and 20265 times the base
45V clean hydrogenApplicable percentage of $0.60 per kg, inflation adjusted5 times the base
45Z clean fuel20 cents per gallon, inflation adjusted after 2024$1.00 per gallon, inflation adjusted
45U existing nuclear0.3 cents per kWh, inflation adjusted5 times the base (prevailing wage only)
30C refueling property (business)6 percent, up to $100,000 per item30 percent (5 times)
45L multifamily homes$500 or $1,000 per unit$2,500 or $5,000 per unit (prevailing wage only)
179D commercial buildings2026: $0.59 to $1.19 per sq ft2026: $2.97 to $5.94 per sq ft
48C advanced energy projects6 percent30 percent

For 45Y the IRS printed both 2026 figures: the base “applicable amount provided in section 45Y(a)(2)(A) is 0.6 cents (or $0.006)” and the alternative amount is 3.1 cents. For 179D the IRS table notes that “These square footage amounts increase significantly if Prevailing Wage and Apprenticeship (PWA) requirements are met.” Which of these credits are still open in 2026 is on the 2026 status page.

Three ways to earn the bonus

PathWhat you needWhere it is
Small facilityMaximum net output under 1 MW (AC)45(b)(6)(B)(i); 45Y, 48, 48E
Early startConstruction (or 179D installation) began before Jan 29, 202345(b)(6)(B)(ii); Treas. Reg. 1.45-6(b)(2)Treas. Reg. 1.45-6Treasury regulations, eCFR
PWAPrevailing wages, apprentices, records and Form 722045(b)(7) and (8); Treas. Reg. 1.45-7Treas. Reg. 1.45-7Treasury regulations, eCFR, 1.45-8, 1.45-12

If either exception applies, you do not need to meet PWA, and you do not file the verification form. The Form 7220 instructions say: “If you’re claiming the increased credit or deduction amounts and satisfy the BOC or the One Megawatt exception, you’re not required to file Form 7220.” You still need records that show the exception applies: the nameplate data, or the evidence of when construction began.

The 1 MW exception

Section 45(b)(6)(B)(i) covers “A facility with a maximum net output of less than 1 megawatt (as measured in alternating current).” The same test is in 45Y and 48E. Section 48 applies it to an energy project under 1 MW of electrical or thermal energy, and 48E applies it to energy storage technology “with a capacity of less than 1 megawatt”. T.D. 9998 confirms that this exception exists only under 45, 45Y, 48 and 48E. Carbon capture, hydrogen, clean fuel, refueling property, homes and buildings have no size exception.

How to measure: under Treas. Reg. 1.45-6(c)Treas. Reg. 1.45-6Treasury regulations, eCFR, “nameplate capacity is determinative”, meaning the manufacturer's maximum steady state output under standard conditions. For section 48 projects, Treas. Reg. 1.48-13(e)Treas. Reg. 1.48-13Treasury regulations, eCFR adds conversion rules for thermal and gas property: one MW equals 3.4 million Btu per hour for heating and 284 tons for cooling.

Watch the project rule. You cannot split one project into small pieces to stay under 1 MW. Under Treas. Reg. 1.48-13(d)Treas. Reg. 1.48-13Treasury regulations, eCFR, “the term energy project means one or more energy properties (multiple energy properties) that are operated as part of a single energy project”, and several properties are treated as one project when four or more listed factors are present, such as contiguous land, a common power purchase agreement, a common intertie or substation, or common permits. If the combined nameplate is 1 MW or more, the PWA rules apply to the whole project.

The January 29, 2023 construction start exception

Section 45(b)(6)(B)(ii) exempts “A facility the construction of which begins prior to the date that is 60 days after the Secretary publishes guidance with respect to the requirements of paragraphs (7)(A) and (8).” That guidance was Notice 2022-61, published in the Federal Register on November 30, 2022. Treas. Reg. 1.45-6(b)(2)Treas. Reg. 1.45-6Treasury regulations, eCFR turns it into a fixed date: construction that began before January 29, 2023. T.D. 9998 lists the credits with this exception: 30C, 45, 45Q, 45V, 45Y, 48, 48E and 179D (for 179D the test is when installation began).

When construction began is a tax question, not a payroll one. The IRS notices allow the physical work test or the 5 percent safe harbor for most credits, plus a continuity requirement; for 45Y and 48E, taxpayers “may rely on the Continuity Safe Harbor provided the facility is placed in service no more than four calendar years after the calendar year during which construction began”. A project that misses continuity loses the exception and falls back into the PWA rules for work on or after January 29, 2023. Wind and solar facilities that rely on construction beginning by July 4, 2026 face the stricter Notice 2025-42 rules; see the 2026 status page.

Hydrogen is a partial exception. A 45V facility that began construction before January 29, 2023 is excused from the construction rules, but section 45V(e)(2)(A) still requires prevailing wages on alteration or repair after that date.

Work done before January 29, 2023 never counts

Separate from the exception, the final regulations exclude early work from the tests for every credit. Treas. Reg. 1.45-7(a)(2)Treas. Reg. 1.45-7Treasury regulations, eCFR says “Taxpayers are excepted from the Prevailing Wage Requirements with respect to any activities that would be considered construction, alteration, or repair of the qualified facility and that occurred prior to January 29, 2023.” Treas. Reg. 1.45-8(a)(2)Treas. Reg. 1.45-8Treasury regulations, eCFR says the same for apprentices. The preamble to T.D. 9998 explains: “The final regulations provide that any work performed before January 29, 2023 (the date that is 60 days after the publication of Notice 2022-61) is not subject to the PWA requirements, regardless of whether there is an applicable BOC Exception.”

That matters for 45L, 45Z and 48C, which have no construction start exception, and for projects that began before the date but later lost the exception. Only work on or after January 29, 2023 is tested. Labor hours from before that date do not count in the apprentice percentage either.

Credits with no exception

For 45L, 45U, 45Z and 48C, PWA (or the prevailing wage half for 45L and 45U) is the only path to the larger amount. For 45Q, 45V, 45Z, 30C, 179D and 48C, size does not help. On those jobs every covered contractor and subcontractor must pay the prevailing wage rates, and the apprentice rules apply where the credit has them.

Deciding whether to chase the bonus

An owner may claim only the base amount and skip PWA. Nothing in the regulations forces the larger claim. But the difference is large (6 percent versus 30 percent on an investment credit), and the costs of meeting PWA are mostly payroll and paperwork. The risk is a failure found later: an underpaid worker or missed apprentice hours. The rules let you cure those failures with back pay, interest and a penalty instead of losing the bonus; see fixing PWA failures. If you do not cure after the IRS finds a failure, no penalty is assessed but the increased amount is lost, and the base credit may still be claimed (Treas. Reg. 1.45-7(c)(1)(iii))Treas. Reg. 1.45-7Treasury regulations, eCFR. On a credit taken under elective pay or sold to a buyer, the lost increase has usually been paid or sold already, so it must be repaid with 20 percent added unless there is reasonable cause (IRC 6417(d)(6) and 6418(g)(2))IRC 6417Internal Revenue Code, Cornell LIIIRC 6418Internal Revenue Code, Cornell LII; see elected or transferred credits and elective pay for public owners.

Before construction starts, the owner and contractors should agree in writing which path the project uses. If it is PWA, the subcontracts should carry the wage determination, the apprentice plan and the record duties.

Questions filers ask

Do projects under 1 MW need to pay prevailing wages?

Not for the 5x amount under 45, 45Y, 48 or 48E, if the maximum net output (nameplate, AC) is under 1 MW. Check the project aggregation rule first. Other credits, such as 30C, 45Q or 179D, have no size exception.

Our project started construction in December 2022. Do we need PWA?

If construction began before January 29, 2023 under the IRS beginning of construction rules, and the credit has the exception (30C, 45, 45Q, 45V, 45Y, 48, 48E, 179D), you do not need PWA for the increased amount. For 45V, prevailing wages still apply to later alteration and repair.

Is the exception date January 29 or January 30, 2023?

The final regulations, the IRS FAQ and the 2026 IRS notices all use construction beginning before January 29, 2023. Use that date.

If we use an exception, do we file Form 7220?

No. The Form 7220 instructions say you are not required to file it when you satisfy the construction start or the 1 MW exception. Keep evidence that the exception applies.

Is the 5x on top of the energy community or domestic content bonuses?