Agency: LEO Wage and Hour Division. Contracts that require Davis-Bacon rates are exempt. Law: 2023 PA 10, MCL 408.1101 to 408.1126, as of November 2026.
At a glance
For six years Michigan had no prevailing wage law. The old act's sections now read “408.551-408.558 Repealed. 2018, Act 171, Imd. Eff. June 6, 2018.” The Legislature then passed a new Prevailing Wages on State Projects act, 2023 PA 10, which the compiled law shows as effective February 13, 2024. 2024 PA 110, effective April 2, 2025, added contractor registration, energy facility projects and a state payroll database. The Michigan Department of Labor and Economic Opportunity (LEO), through its Wage and Hour Division, runs the program. This page reflects the act as compiled through PA 114 of 2026 and the LEO page, read November 21, 2026.
| Item | Michigan rule | Where it comes from |
|---|---|---|
| Covered work | State projects and energy facility projects | MCL 408.1101 |
| Dollar threshold | None in the act (as of November 2026) | MCL 408.1101, 408.1102 |
| Rates | Local collective bargaining rates, set by LEO | 2023 PA 10, sec. 4 |
| Registration | Annual state project registration; LEO fee $500 | MCL 408.1102, 408.1102a; LEO page |
| Certified payroll | Within 10 days after each pay period, to LEO's database | MCL 408.1122 |
| Civil penalty | Up to $5,000 per violation plus 10% | 2023 PA 10, sec. 13 |
Which projects are covered
A "state project" is new construction, alteration, repair, installation, painting, decorating, completion, demolition, conditioning, reconditioning or improvement of public buildings, schools, works, bridges, highways or roads that is authorized by a public contracting agent and that is sponsored or financed in whole or in part by the state. A public contracting agent is an officer, school board, board or commission of the state, or a state institution supported in whole or in part by state funds. The definition does not list cities, counties or townships, so a local unit that has state money in a project should ask LEO before it bids.
Since April 2, 2025, "state project" also includes every "energy facility project," meaning “new construction, completion, demolition, major alteration, or repowering of an energy facility”. An energy facility is a wind, solar or energy storage system with a nameplate capacity of 2 megawatts or more. These projects can be private: a "private contracting agent" is any business that contracts for an energy facility project. LEO's page puts it plainly: “Includes energy facility projects, such as wind farms with a capacity of 2 megawatts or more.”
The act covers "construction mechanics": skilled or unskilled mechanics, laborers, workers, helpers, assistants and apprentices on a state project. It excludes executive, administrative, professional, office and custodial employees, and workers under the state civil service commission. Out of scope:
- Contracts that require Davis-Bacon rates, or that carry wage schedules equal to local collective bargaining rates (see the Davis-Bacon section below).
- Projects paid for in whole or part by a school millage authorized under the Revised School Code before the act took effect (2023 PA 10, sec. 9).
- Contracts entered into, or bids made, before the act took effect.
The act sets no minimum dollar amount.
Rates
Before advertising for bids, the contracting agent must have LEO determine the rates for every class of construction mechanic on the job. The schedule goes into the specifications and is printed on the bid forms. Timing matters: if the contract is not awarded or construction started within 90 days of LEO's determination, LEO must redetermine the rates before the award.
LEO sets wages and fringe benefits “at the same rate that prevails on projects of a similar character in the locality under collective agreements or understandings between bona fide organizations of construction mechanics and their employers”. If no agreements exist in a locality (a county, city, village, township or school district), LEO uses the nearest similar locality that has them. LEO posts its Official Rate Schedules by county on its prevailing wage page. Contractors must keep the rates posted on site and keep a record of each mechanic's name, occupation, wages and benefits (sec. 5). For how union-based rates compare with federal survey rates, see how Davis-Bacon rates are set.
Certified payroll
Under MCL 408.1122, contracting agents, contractors and subcontractors keep certified payroll records for at least 3 years, and “not later than 10 days after the end of a pay period, a contractor or subcontractor shall transmit the certified payroll records for the pay period” to the right place:
| When | Where payroll goes |
|---|---|
| Before April 2, 2026 (1 year after 2024 PA 110 took effect) | The contracting agent, which forwards it to LEO within 10 days |
| On or after April 2, 2026 | LEO's online certified payroll database |
The database records each mechanic's skill level (apprentice, journeyman or other), gross wages for the pay period and starting and ending times each day. It “Does not display or otherwise include a construction mechanic's home address, telephone number, or Social Security number.” At each upload, the person submitting attests by electronic signature that the record is complete and accurate, that the rates paid are not less than required, that they reviewed it, and that a violation can cost the firm its registration. LEO's page says registered contractors receive instructions for the state's certified payroll database. It also says the project registration form creates the project in LCP Tracker, which is needed to submit payrolls.
Two groups do not send payroll to the database: firms that are otherwise required by law to send certified payroll to the state transportation department, and firms doing only routine maintenance or repair on an energy facility. LEO publishes a Certified Payroll Form, instructions, and WHD 9917 and 9918 information sheets. For the federal form, see the WH-347 guide.
Contractor registration and fees
Registration is a precondition to bidding. Under MCL 408.1102(3), a contractor may not “Submit a bid for a state project unless the contractor holds a state project registration.” It also may not work on a state project, list an unregistered subcontractor on a bid, or sign with an unregistered subcontractor. A subcontractor may not work or contract on a state project without its own registration. The bid must include a copy of the registration for the contractor and each subcontractor selected at bid time.
| Registration rule | Detail |
|---|---|
| Term | Valid for 1 year, with one renewal date set by LEO (MCL 408.1102a(3)) |
| Fee | LEO: $500 a year (as of November 2026); the statute allows a prorated fee |
| Application | Business name and address, entity type, owners with a financial interest, unemployment insurance number, and proof of compliance with licensing and other laws |
| Decision | LEO grants or denies within 15 business days of a complete application |
| Each project | Registered contractors must also register every covered project |
| Suspension | Possible for significant or repeated violations, but only once LEO has a rule in effect |
A registration is valid for one year. LEO's page states that “All contractors and subcontractors must register and pay a $500 annual fee”, payable online or by check to the State of Michigan. Before a subcontractor starts, check that its registration is current and that the name and entity on it match the firm you are signing. Its 1099-NEC reporting starts with a correct W-9, covered at tincompliance.com.
Apprentices
Apprentices are construction mechanics under the act, and the payroll database records whether each worker is an apprentice or journeyman. The act text we read does not set apprentice ratios or a separate apprentice wage rule. Ask LEO how its rate schedules treat apprentices before you bid. The federal approach is in Davis-Bacon apprentices.
Penalties and worker claims
LEO can “assess a civil penalty of not more than $5,000.00 for each violation of this act and an additional 10% penalty as determined by the commissioner”. The penalty is due within 15 working days, and the Department of Treasury can offset unpaid amounts against money the state owes the employer. Separately, a county prosecutor or the Attorney General can sue to collect a civil fine of up to $5,000, and a contractor and its subcontractor are jointly and severally liable (sec. 8).
| Tool | Rule | Section of 2023 PA 10 |
|---|---|---|
| Contract termination | The contracting agent may end the contractor's right to proceed on underpaid work; contractor and sureties pay excess completion costs | Sec. 6 |
| LEO investigation | Right to enter the project, inspect payroll, and interview workers in private | Secs. 14, 18 |
| Make-whole orders | LEO may order the agent, contractor or subcontractor, jointly and severally, to pay amounts owed | Sec. 16 |
| Complaint deadline | LEO will not accept complaints more than 3 years after the violation | Sec. 17 |
| Retaliation | Complaint within 90 days; rebuttable presumption if removed from the project or denied hours | Secs. 7, 19 |
| Review | Employer or employee may request review within 14 days; hearing officer decides | Sec. 21 |
LEO cannot take a complaint filed more than 3 years after the alleged violation. A worker who faces retaliation files with LEO “not later than 90 days after the believed retaliatory act”. Workers can also go to court. Every contract must name construction mechanics as intended beneficiaries, so a worker can sue the contractor or subcontractor for unpaid wages and benefits, reinstatement, costs and attorney fees (sec. 12). If the contracting agent left the requirement or the rate schedule out of the bid documents, the worker can sue the agent for lost wages, interest up to 10 percent a year and fees (sec. 11). A worker does not have to use LEO's process first (sec. 24). We found no published Michigan debarment list in the sources read; the registration suspension power is the closest tool.
Recent changes: repeal and return
| Date | What happened | Source |
|---|---|---|
| June 6, 2018 | 1965 PA 166 (MCL 408.551 to 408.558) repealed by 2018 PA 171, an initiated law approved by the Legislature | MCL note |
| March 24, 2023 | 2023 PA 10 approved by the Governor and filed | Public act text |
| Feb. 13, 2024 | 2023 PA 10 takes effect | MCL history |
| April 2, 2025 | 2024 PA 110 takes effect: registration (sec. 2a), energy facility projects, payroll database | MCL history |
| April 2, 2026 | Certified payroll goes to LEO's database instead of the contracting agent | MCL 408.1122 |
The 2018 repeal note says Public Act 171 of 2018 was proposed by initiative petition and was approved by the Senate and House on June 6, 2018. Firms that last worked Michigan public jobs before 2018 should not assume the old practice applies: the registration and database rules are new.
State law and Davis-Bacon on the same job
Michigan's act steps aside for federal rates. Contracts on state projects that require prevailing wages set by the U.S. Secretary of Labor under 40 U.S.C. 314140 U.S.C. 3141United States Code, Cornell LII to 3148, or that carry schedules equal to local collective bargaining rates, “are exempt from the provisions of this act”. LEO's page lists the same exemption. On a job with Davis-Bacon rates in the contract, follow the federal rules for wages, payroll and apprentices (see Davis-Bacon coverage). The sources do not say whether the state registration still applies on such a job; ask LEO before you bid.
Questions filers ask
Is Michigan prevailing wage back?
Yes. The 1965 act was repealed in 2018. The new act, 2023 PA 10, took effect February 13, 2024, and 2024 PA 110 added registration and the payroll database effective April 2, 2025.
Do subcontractors need their own Michigan registration?
Yes. A subcontractor may not work on or contract for a state project without a state project registration, and the prime may not list or hire an unregistered subcontractor.
Where do I send certified payroll now?
For pay periods on or after April 2, 2026, into LEO's online certified payroll database within 10 days after the pay period ends, with an electronic signature attestation.
Do wind and solar farms have to pay Michigan prevailing wage?
Energy facility projects (wind, solar or storage of 2 megawatts or more) are state projects under the act, including private ones. Routine maintenance or repair is exempt from the payroll database filing.
Does the state act apply if the contract has Davis-Bacon rates?
No. Contracts that require Davis-Bacon rates are exempt from the act.
How long does a worker have to complain?
Three years after the violation for wage complaints to LEO, and 90 days after a retaliatory act for retaliation complaints.