How rates are set
Surveys, the majority and 30 percent tests, weighted averages, and the other ways a rate gets onto a wage determination.
Construction types
Building, residential, highway and heavy: how to place a project, count stories, and decide when a mixed project needs two wage determinations.
How to read a WD
A walk-through of a real general decision: the header, the modification record, the rate blocks, the identifiers and the notes.
Which modification applies
Lock-in rules before award, the 10-day and 90-day rules for sealed bids, and when a new modification comes in after award.
Conformance (SF-1444)
When work is not covered by any classification on the wage determination: the three criteria, the reasonable relationship test and the SF-1444 process.
Supplemental WDs (clean energy)
For credit projects with no general wage determination or a missing classification: when to ask DOL, what to send, and how long the answer lasts.
Wage determination tools


Templates
Conformance request checklist
A checklist for adding a missing classification to a Davis-Bacon wage determination: the criteria, the SF-1444 blocks, the parties' signatures and what to do after the ruling.
