Agency: Prevailing Wage Commission; TDLWD Labor Standards Unit. Law: Tenn. Code Ann. 12-4-401 to 12-4-415; Tenn. Comp. R. & Regs. 0800-03-02, as of November 2026.
At a glance
The Tennessee Department of Labor and Workforce Development (TDLWD) describes the law in one line: the Prevailing Wage Act “protects wage earners from unfair practices regarding pay on state-funded highway construction projects”. Its formal name is the Prevailing Wage Act for State Highway Construction Projects, Tenn. Code Ann. 12-4-401 to 12-4-415, in its current form since January 1, 2014. There is no Tennessee prevailing wage law for state buildings, schools or general local construction in the sources we read.
This page uses the compiled Act text TDLWD posts, the Commission's rules as published by the Tennessee Secretary of State (chapter 0800-03-02, current version effective March 9, 2026) and the two TDLWD web pages, all read on November 21, 2026.
| Item | Tennessee rule | Where it comes from |
|---|---|---|
| Covered work | State highway construction projects: streets, highways and bridges | 12-4-402 |
| Who must pay | Every highway contractor and subcontractor on a state contract | 12-4-403, 12-4-408 |
| Dollar threshold | None stated in the Act (as of November 2026) | 12-4-401 to 12-4-415 |
| Who sets rates | The five-member Prevailing Wage Commission, once a year | 12-4-404, 12-4-405 |
| Rate area | One statewide area | 12-4-405(2)(B) |
| Certified payroll | Weekly, to the contracting state agency | Rule 0800-03-02-.05(1)(a)5 |
| Records | Keep payroll records 1 year after the project is complete | 12-4-411(b) |
| Remedy | Suit on the contractor's performance bond; reletting the contract | 12-4-412 |
Which projects are covered
Section 12-4-403 says any highway contractor entering into a state contract for work on state highway construction projects “shall pay not less than the prevailing wage rate for all types and classifications of such work as determined by this part”. Three defined terms set the reach:
| Term | Meaning | Section |
|---|---|---|
| State highway construction project | Any construction project to build, rebuild, locate, relocate or repair streets, highways or bridges | 12-4-402(5) |
| State contract | Any contractual agreement, written or oral, with the state for work on a state highway construction project | 12-4-402(4) |
| Highway contractor | Any contractor, subcontractor, person, firm or corporation engaged in that work | 12-4-402(2) |
The Commission's rules fill in two points that the Act leaves open. First, a "public highway" in the rules includes roads built or maintained by the state, a municipality or a political subdivision “that is funded in whole or in part with federal or state highway funds”. The rules then apply the rates to any state agency, municipality, county or other political subdivision letting a state highway construction project. Second, a "covered worker" is one employed to perform construction or maintenance on a public highway, and a "subcontractor" includes a material supplier whose employees work on the site, if they spend as much as 20 percent of their work time there.
The rules also draw a firm line for voluntary use: “If an entity not defined above so chooses to include prevailing wage rates, the Tennessee Department of Labor and Workforce Development has no jurisdiction to enforce those prevailing wage rates.” A city that copies the state highway rates into a building contract, for example, enforces that term itself.
We found no dollar threshold in the Act text or the rules. A $50,000 figure appears in older secondary summaries; we could not confirm it on a Tennessee source, so it is not used here. Ask the contracting agency if a small job is in question.
Rates
The Commission has five members: the commissioner of labor and workforce development (chair), the state architect, the commissioner of transportation or a designee, and two members appointed by the governor for two-year terms. Under 12-4-413 it may delegate administrative work to TDLWD, which says it conducts the annual survey of highway contractors (TDLWD page).
- By October 31, any highway contractor may certify payroll copies, hours and straight-time rates for July, August and September (12-4-405(1); Rule .08).
- The Commission averages the hourly rate for each classification across one statewide area (12-4-405(2)(B) and (4)).
- If economic conditions warrant, it may add or subtract up to 6 percent based on the previous year's rates (12-4-405(4)).
- By December 1 it gives notice of the rates, and holds a public hearing within 10 days of the notice (12-4-405(5), 12-4-406(a)).
- Within 10 days after the hearing it gives notice of the final rates; judicial review runs under the Uniform Administrative Procedures Act (12-4-406).
The adjustment is limited to “a percentage factor of not more than six percent (6%)”. Survey data is straight time only: “Fringe benefits or overtime rates shall not be included in the hourly rates submitted.” Where four or fewer unaffiliated companies report a craft, those responses may be dropped and the old rate carried forward or adjusted.
The rates run on the calendar year. Rule .03 says the rate “shall be effective from January 1 to December 31 of each year”, and Rule .04 puts into each bid package the rates in effect 10 days before bids are received. Those same rates go into the contract and stay with it.
TDLWD posts the current list. The 2026 Highway Prevailing Wage Rates, effective January 1, 2026, cover 25 classifications. A few examples (2026, TDLWD, hourly):
| Classification | 2026 rate |
|---|---|
| Unskilled Laborer | $23.52 |
| Skilled Laborer | $26.40 |
| Carpenter/Leadsperson | $26.73 |
| Class "A" Operators | $31.00 |
| Truck Driver (5 or more axles) | $30.93 |
| Electrician | $39.21 |
Classify each worker by the Commission's schedule; Rule .02 defines every class, from Blaster to Worksite Traffic Coordinator. Rules .01 and .02 were amended effective March 9, 2026, so check the current definitions before you assign a class.
Certified payroll
The Act itself only says contractors must furnish to the state agency whatever forms, papers and payroll copies the agency requires to show compliance (12-4-411(a)). The Commission's rules set the schedule. Every state highway contract must require each contractor and subcontractor to:
- Classify all covered workers by the Commission's schedule (Rule .05(1)(a)1).
- Post the rates at the site in a prominent place and keep them available to workers (Rule .05(1)(a)2; 12-4-410).
- Pay overtime as other federal or state law or the contract requires, and make only deductions authorized by law (Rule .05(1)(a)3 and 4).
- “Submit weekly a copy of all payrolls to the contracting state agency.” Certify that the payrolls are correct and complete, that the rates equal or exceed the Commission's, and that each class matches the work (Rule .05(1)(a)5).
- Let the agency, the Commission and TDLWD inspect employment records and visit the project (Rule .05(1)(a)5).
The agency forwards the weekly payroll statements to the Commission, and TDLWD checks them against site interviews to confirm workers are classified and paid correctly (Rule .07). Keep the records: “Payroll records shall not be destroyed for one (1) year following the completion of the state highway construction project.” No state payroll portal appears in the sources; the filing goes to the contracting agency in the form it asks for. For other states, see certified payroll by state.
Contractor registration and fees
We found no prevailing wage contractor registration or fee in the Act, the rules or the TDLWD pages (as of November 2026). The duty to report runs the other way: state agencies must send TDLWD the project name, site address and the successful bidder's name and address within 10 working days of the project start date (Rule .06).
Apprentices
The rules define apprentices as persons registered individually in a bona fide program registered with the Bureau of Apprenticeship and Training of the U.S. Department of Labor. The contracting officer must require evidence of the indenture or registration “when the apprentice's name first appears on a submitted payroll”. The Act and rules we read do not set an apprentice wage scale or ratio, so ask the contracting agency how apprentices are to be shown on the payroll. The federal rules are in Davis-Bacon apprentices.
Penalties, debarment and worker claims
The Act does not set fines or debarment. It works through the contract and the bond. Under 12-4-409, the bond of every highway contractor and subcontractor must guarantee faithful performance of every requirement of the Act. Then 12-4-412 gives two remedies:
| Remedy | Who uses it | Section |
|---|---|---|
| Suit for breach of any condition of the performance bond | The Commission, or any employee whose wages are set under the Act | 12-4-412 |
| Advertise the work and relet the contract | The state agency that awarded it, after a breach of the bond | 12-4-412 |
In the statute's words, on a breach the agency “may advertise the work and relet the contract in the same manner as the original letting”. Losing the contract, and a claim against your bond, are the real risks. A worker who thinks the rate was short can also call the Labor Standards Unit at 844-224-5818 (TDLWD page).
Recent changes
| Date | Change | Source |
|---|---|---|
| March 9, 2026 | Commission rules amended (filed December 9, 2025), including the definitions in Rule .01 and the craft classifications in Rule .02 | Rule 0800-03-02 administrative history |
| January 1, 2026 | 2026 Highway Prevailing Wage Rates took effect (25 classifications) | TDLWD prevailing wage page |
| November 2026 | The Commission lists tentative meetings on November 12 and November 30, 2026; under the Act, notice of rates is due by December 1 | Commission page; 12-4-405(5) |
The Act itself has not changed since the 2013 amendments that took effect January 1, 2014, in the compiled text TDLWD posts. We did not read the code on the LexisNexis site, so confirm the current text there before relying on a specific subsection.
State law and Davis-Bacon on the same job
The rules' definition of a public highway includes roads funded with federal highway funds, so a federal-aid highway job can carry both the Commission's rates and federal Davis-Bacon rates under the Federal-Aid Highway Acts (see the Related Acts). DOL's general statement is that contractors on federally assisted projects “may also be subject to additional prevailing wage and overtime pay requirements under State (and local) laws”. The Tennessee sources we read do not say how to reconcile the two schedules, so ask TDOT or the contracting agency which rate governs each class before you bid. Federal payroll rules, including the WH-347, are in who files certified payroll.
Questions filers ask
Does Tennessee have a prevailing wage law for building construction?
No law covering buildings appears in the sources we read. The Tennessee Act covers state highway construction: streets, highways and bridges.
Is there a minimum contract amount for Tennessee prevailing wage?
None is stated in the Act or the Commission's rules (as of November 2026). Ask the contracting agency if a small job is in question.
When do new Tennessee highway rates take effect?
On January 1 each year. Your contract uses the rates in effect 10 days before bids were received, for the life of the contract.
How often do I send payrolls on a Tennessee highway job?
Weekly, a certified copy of all payrolls to the contracting state agency, which forwards them to the Commission.
Do fringe benefits count toward the Tennessee rate?
The Commission sets straight-time hourly rates, and the survey excludes fringe benefits and overtime. Pay at least the listed hourly rate for each class.
How long must I keep payroll records?
At least one year after the state highway construction project is completed (Tenn. Code Ann. 12-4-411(b)).