- Post
- Wage determination and WH-1321 poster at the site
- Pay
- At least once a week
- Payroll
- Weekly, with a signed Statement of Compliance
- Records
- At least 3 years after the prime contract work is done
When to use it
Subcontractors often learn the Davis-Bacon rules from the prime. This notice does that in one page and asks for a signature. Send it with the subcontract and the wage determination, and again if a contract change brings in a new wage determination. Under 29 CFR 1.6(a)(1), once incorporated, “the wage determination generally applies for the duration of the contract or project, except as specified in this section”; see which modification applies.
The notice is a summary. The clauses in the subcontract control, and the prime stays responsible for every tier. Onboarding checks come first; use the subcontractor onboarding checklist. This template is a general starting point, not legal advice. Adapt it to your contract, your wage determination and any state law that also applies, and have counsel review it where the stakes are high.
The notice
Template from prevailingwagerules.com, based on 29 CFR 5.5(a) and (b); 29 CFR 3.4 and 1.6; DOL Fact Sheet 66. Replace the highlighted text, check every line against your plan's facts, and delete this note before you use it.
Notice to Subcontractors: Davis-Bacon Labor Standards
[Prime contractor letterhead]
[Date]
To: [Subcontractor legal name]
Attn: [Contact name and title]
Project: [Project name and location]
Prime contract no.: [Contract or project number]
Subcontract no.: [Number]
Re: Davis-Bacon labor standards, wage determination and posting duties
This notice summarizes the labor standards duties that apply to your work on this project. It does not replace the clauses in your subcontract, which control.
1. The wage determination
The wage determination for this project is [WD number], modification [number], dated [date]. A copy is attached. Pay each laborer and mechanic, including working foremen who do manual work, at least the basic hourly rate and fringe benefits listed for the classification of work they actually perform. If a worker does work in more than one classification, keep records of the time in each.
If any of your workers will do work that is not listed on the wage determination, tell us before the work starts so a conformance request can be made: [Prime contact name, email].
2. Posting at the site
Post the wage determination, any conformed classifications and rates, and the Davis-Bacon poster (WH-1321) at the site of the work in a prominent and accessible place where your workers can easily see them, and keep them posted for as long as you are on site.
3. Weekly pay and certified payroll
• Pay your workers at least once a week, unconditionally, with no rebate and no deductions other than those 29 CFR part 3 permits.
• Send a certified payroll for each week in which you perform covered work, with a signed Statement of Compliance, to [Prime contact or electronic system] by [day of week] after your regular pay date.
• Show workers by an identifying number (for example the last four digits of the SSN). Do not put full Social Security numbers or home addresses on the weekly payroll. [Optional: Send the full numbers and contact details separately to [contact] for our records.]
• Mark your last payroll on this project as final.
4. Apprentices
Pay a worker at an apprentice rate only if the worker is individually registered in a program registered with DOL's Office of Apprenticeship or a recognized State Apprenticeship Agency, and only within the program's ratio. Send us the program and registration documents before the apprentice starts.
5. Overtime
[Use if the prime contract is over $100,000 and subject to CWHSSA:] Pay laborers and mechanics at least one and one-half times their basic rate of pay for all hours worked over 40 in a workweek.
6. Your own subcontractors
Put these labor standards clauses and the wage determination in every lower-tier subcontract, with a clause requiring your subcontractors to do the same. Do not subcontract any part of this work to a debarred firm. Tell us the name of each lower-tier subcontractor before it starts work.
7. Records and access
Keep your payroll and basic records, certified payrolls and subcontract documents for at least 3 years after all work on the prime contract is completed. Make them available to [Agency name] and the U.S. Department of Labor, and allow them to interview workers on the job during working hours.
8. No retaliation
Do not discharge, threaten or otherwise discriminate against any worker or job applicant for raising a wage concern, filing a complaint, cooperating in an investigation, or telling others about their rights.
9. State law
[If a state prevailing wage law also applies:] This project is also covered by [state law]. Its additional duties are: [list, e.g. state registration, state payroll filing].
Acknowledgment
Please sign and return a copy by [date].
Received and understood: ____________________________
Name and title: [Subcontractor signer]
Date: [Date]
[Prime contractor signer name and title]
[Phone, email]
The rules behind each section
Section 1, the rates. All laborers and mechanics on the site “will be paid unconditionally and not less often than once a week”, at no less than the wage determination rates, “regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics”. A crew paid on a 1099 is still owed the rate. Split classifications need records of the time in each. See who counts as a laborer or mechanic.
Section 2, posting. The wage determination, with any conformed rates, and the WH-1321 poster “must be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers”. The duty is the sub's as well as the prime's.
Section 3, certified payroll. The sub must deliver each payroll “within 7 days after the regular payment date of the payroll period”, and the prime needs it earlier to review and pass it on. Set your own internal day in the blank. The certified payroll deadline tool works out the dates.
Section 5, overtime. The CWHSSA clauses in 29 CFR 5.5(b) go into contracts over $100,000 that are subject to that law. Delete the section if they do not apply; see Davis-Bacon overtime.
Section 6, flow-down. The rule is in 29 CFR 5.5(a)(6): “The contractor or subcontractor must insert in any subcontracts the clauses contained in paragraphs (a)(1) through (11) of this section, along with the applicable wage determination(s)”. Do not rely on the clauses applying automatically: the 2023 rule's 5.5(e), incorporation by operation of law, was vacated in AGC v. DOL, No. 5:23-cv-272-H (N.D. Tex.), Final Judgment, Doc. 108, June 24, 2026. If a lower-tier sub underpays, “the prime contractor and any subcontractor(s) responsible will be liable for any unpaid wages and monetary relief”.
Section 7, records and access. Payrolls and basic records are kept “for a period of at least 3 years after all the work on the prime contract is completed”. The contractor “must permit such representatives to interview workers during working hours on the job”. Refusing can lead to suspended payments and debarment; see withholding and debarment.
Section 8, no retaliation. 29 CFR 5.5(a)(11) bars retaliation against a worker or applicant for raising concerns, complaining, cooperating or telling others their rights. DOL's Fact Sheet 66 is direct: “Retaliation is prohibited against any worker or job applicant for engaging in protected activities.”
Section 9, state law. Many states add their own rules on the same job. Check the state page and fill in the duties that apply.
Questions filers ask
Does the notice replace the clauses in the subcontract?
No. The clauses and the wage determination must be in the subcontract itself under 29 CFR 5.5(a)(6). The notice explains them and gets an acknowledgment.
Who posts the wage determination when several subs are on site?
29 CFR 5.5(a)(1)(i) puts the posting duty on the contractor and its subcontractors. A single shared posting place works if every crew can easily see it.
Can a subcontractor pay workers every two weeks?
No. Laborers and mechanics on covered work must be paid not less often than once a week.
Do we send a new notice when the wage determination changes?
Usually the wage determination in the contract stays for the job. If a contract change brings in a new one, send the new wage determination with a fresh notice and get it acknowledged.