Template

Subcontractor prevailing wage onboarding checklist

Use this checklist before a subcontractor starts work on a Davis-Bacon or Related Act job. The prime answers for every lower-tier sub's wages and payrolls, so the checks belong before the first payroll week, not after it. Download it as Word or plain text and fill in one copy per subcontractor.

Updated November 21, 2026Sources 29 CFR 5.5(a)(3), (a)(4), (a)(6) and (a)(10); 40 U.S.C. 3144(b); WH-347 instructions
At a glance
Who is liable
The prime, for every lower-tier sub
Flow-down
Clauses and wage determinations in every subcontract
Debarment
No subcontract to an ineligible firm
Use
One copy per subcontractor, before work starts

When to use it

On a covered job, a subcontractor's mistakes become the prime's problem. The clause in 29 CFR 5.5(a)(6) says “The prime contractor is responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in this section.” If a sub underpays, the prime and the responsible sub are both liable for the back wages and interest, and both may face debarment. That is why the checks in this list come before the sub's crew arrives.

Fill in one copy for each subcontractor at every tier, and keep it in the project file. The guides on withholding and debarment and who files certified payroll explain the stakes. This template is a general starting point, not legal advice. Adapt it to your contract, your wage determination and any state law that also applies, and have counsel review it where the stakes are high.

The checklist

Download .docxHighlighted text is what you replace.

Template from prevailingwagerules.com, based on 29 CFR 5.5(a)(3), (a)(4), (a)(6) and (a)(10); 40 U.S.C. 3144(b); WH-347 instructions. Replace the highlighted text, check every line against your plan's facts, and delete this note before you use it.

Subcontractor Prevailing Wage Onboarding Checklist

Project: [Project name]
Prime contract no.: [Contract or project number]
Subcontractor: [Legal business name]
Scope of work: [Trades and work this sub will perform]
Prepared by: [Name] on [Date]

1. Identity and eligibility

☐ Legal business name as shown on the sub's Form W-9: [Legal name]

☐ EIN from the W-9: [EIN]

☐ Legal name and EIN checked against IRS records before the sub starts work: [Date checked and result]

☐ Name on the W-9 matches the name the sub will use on its certified payroll and on the subcontract: [Yes or No]

☐ Debarment check done on SAM.gov for the firm and its principals: [Date and result]

☐ State public works registration checked, if the state requires one: [State, registration no., expiration date, or Not required]

☐ Sub's lower-tier subcontractors listed, and each one put through this same checklist: [Names, or None]

2. The subcontract

☐ The Davis-Bacon labor standards clauses are written into the subcontract in full or by reference.

☐ The wage determination(s) are attached: [WD number(s) and modification number(s)]

☐ A clause requires the sub to put the same clauses and wage determination(s) in every lower-tier subcontract.

☐ If the prime contract is over $100,000 and subject to CWHSSA, the CWHSSA overtime clauses are included.

☐ Any state prevailing wage clauses that also apply are included: [State law, or None]

☐ The sub has signed its certification that it is not ineligible for award.

3. Classifications and rates

☐ Every trade the sub will use appears on the wage determination: [Classifications]

☐ Any trade that is missing is flagged for a conformance request before work starts: [Classification, or None]

☐ The sub has confirmed it will pay each worker for the classification of work actually performed.

☐ How the sub will meet fringe benefits: [Bona fide plan contributions, cash in lieu, or both]

☐ If the sub credits plan contributions, plan names and hourly credit amounts received: [Plans and amounts]

4. Apprentices

☐ Does the sub plan to pay anyone at an apprentice rate? [Yes or No]

☐ If yes: written evidence of the registered program, each apprentice's registration, and the program's ratio and wage rates received.

☐ Program registered with: [DOL Office of Apprenticeship or State Apprenticeship Agency]

5. Certified payroll set-up

☐ Certified payroll format agreed: [WH-347 or other format with identical Statement of Compliance wording]

☐ Submission method: [Electronic system name, or paper]

☐ Due to the prime by: [Day of week], so the prime can deliver it within 7 days after the regular pay date.

☐ Name and title of the person who will sign the Statement of Compliance: [Name, title]

☐ Whether the prime will require full Social Security numbers and addresses for its own records (never on the weekly transmittal): [Yes or No]

☐ The sub knows to mark its last payroll as final.

6. On site

☐ The sub has copies of the wage determination and the Davis-Bacon poster (WH-1321) to post at the site.

☐ The sub has the prime's contact for wage questions and complaints: [Name, phone, email]

7. Records kept by the prime

• The sub's Form W-9 and the result of the name and EIN check

• The SAM.gov and state registration check results, with dates

• The signed subcontract with the clauses and wage determination(s)

• Apprenticeship program and registration documents

• This checklist, with every line filled in

The rules behind each section

Section 1, identity and eligibility. The certified payroll asks for the firm's legal name. The WH-347 instructions say, for the business name: “Enter the business' legal name.” Getting the sub's Form W-9 and checking its legal name and EIN before work starts means the firm on the subcontract, the firm on the payroll and the firm you pay are the same one. For the W-9, TIN matching and the 1099-NEC you will file for the sub, see tincompliance.com.

The debarment check comes from the contract clause in 29 CFR 5.5(a)(10)(ii): “No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of 40 U.S.C. 3144(b)” or 5.12(a). Under 40 U.S.C. 3144(b), no contract goes to a listed person or a firm in which it has an interest “until three years have elapsed from the date of publication of the list”. The steps are in how to check debarment.

Some states add their own gate. California DIR, for example, requires a registered public works contractor to “only use subcontractors who are registered public works contractors” (DIR page, as of November 2026). Check the state page for the state where the job sits.

Section 2, the subcontract. The flow-down rule is in 29 CFR 5.5(a)(6): the clauses go into every subcontract with the wage determinations, plus “a clause requiring the subcontractors to include these clauses and wage determination(s) in any lower tier subcontracts”. Write them in. The 2023 rule's 5.5(e), which made the clauses effective by operation of law, was vacated by the court in AGC v. DOL, No. 5:23-cv-272-H (N.D. Tex.), Final Judgment, Doc. 108, June 24, 2026. The CWHSSA overtime clauses in 5.5(b) apply to contracts “in an amount in excess of $100,000” that are subject to that law.

Section 3, rates. Workers are paid for the classification of work they actually perform. If a trade is missing from the wage determination, start a conformance request before the work begins, not after the first payroll.

Section 4, apprentices. 29 CFR 5.5(a)(3)(i)(D) says “Contractors with apprentices working under approved programs must maintain written evidence of the registration of apprenticeship programs, the registration of the apprentices, and the ratios and wage rates prescribed in the applicable programs.” Ask for those papers at onboarding. See Davis-Bacon apprentices.

Section 5, payroll set-up. The weekly transmittal carries only a partial worker ID, but the rule adds: “It is not a violation of this section for a prime contractor to require a subcontractor to provide full Social Security numbers” and contact details for the prime's own records. If you use an electronic system, it must accept other methods for a sub that cannot use it. The WH-347 guide covers the form line by line.

Section 6, on site. Fact Sheet 66 says contractors must “post the applicable Davis-Bacon wage determination and the Davis-Bacon poster (WH-1321) on the work site” where workers can easily see them. The notice to subcontractors puts these duties in writing.

Questions filers ask

Do I need to onboard lower-tier subcontractors too?

Yes. The prime is responsible for compliance by any subcontractor or lower-tier subcontractor, so run the same checks on every tier before that firm starts work.

Is a W-9 required by the Davis-Bacon rules?

No. The Davis-Bacon rules do not mention the W-9. It is the practical way to get the sub's legal name and EIN, which the certified payroll and your own 1099-NEC reporting both depend on.

What if a sub turns out to be debarred after it starts?

The clause in 29 CFR 5.5(a)(10)(ii) bars subcontracting any part of the contract to an ineligible firm. Stop and talk to the contracting agency and your counsel about the contract.

Can I require subs to send full Social Security numbers to me?

Yes. 29 CFR 5.5(a)(3)(ii)(B) lets a prime require full numbers and contact details for its own records, as long as they are not put on the weekly certified payroll transmittal.

Does this checklist cover state prevailing wage law?

Only the registration check. State laws add their own payroll, registration and apprentice rules; see the state page for the job's state.