State law
Law
Prevailing wage law in force
Threshold
Over $1,000
Agency
California DIR
Certified payroll
At least monthly, online to DIR (eCPR)
State prevailing wage laws

California prevailing wage law

California requires prevailing wages on public works over $1,000: construction, alteration, demolition, installation, repair and maintenance done under contract and paid for in whole or in part out of public funds. The Director of the Department of Industrial Relations (DIR) sets the rates, every contractor and subcontractor must register with DIR, and each one files certified payroll records directly with the Labor Commissioner online.

Updated November 21, 2026Sources Cal. Labor Code 1720 to 1815; 8 CCR 16204; DIR and DAS public works pages

At a glance

California coverage starts at a very low dollar figure, and three filings run through DIR's online Public Works Website Services: the awarding body's project notice, the contractor's registration and each company's certified payroll.

ItemCalifornia ruleSource
CoveragePublic works over $1,000; no splitting jobs to stay under itLab. Code 1771; DIR FAQ
Small project exemptionUp to $25,000 construction or $15,000 maintenance: no DIR registration or eCPR, but wages still owedLab. Code 1725.5(f), 1771.4(a)(4)
RatesDirector's general determinations (current issue 2026-2)Lab. Code 1770, 1773; DIR
PayrollElectronic, directly to the Labor Commissioner, at least once every 30 daysLab. Code 1771.4
Registration$400 a year, or $800 or $1,200 for two or three fiscal years, as of November 2026Lab. Code 1725.5; DIR
ApprenticesProjects of $30,000 or more; at least 1 apprentice hour per 5 journeyman hoursLab. Code 1777.5

Which projects are covered

The core definition in Labor Code 1720(a)(1) is “Construction, alteration, demolition, installation, or repair work done under contract and paid for in whole or in part out of public funds”. Construction includes preconstruction work such as inspection and land surveying, and cleanup at the jobsite afterward. Section 1771 adds that the wage rule applies “Except for public works projects of one thousand dollars ($1,000) or less”, that it applies only to work done under contract (not an agency's own forces), and that it covers contracts let for maintenance work.

The awarding body can be any public agency or a private entity using public funds. Public funds are not limited to cash: below-market asset transfers, waived or reduced fees, rents or loan costs, contingent loans and credits also count (Lab. Code 1720(b)). Other sections add refuse hauling and some on-hauling of fill (1720.3), ready-mixed concrete delivery (1720.9) and electric transmission work (1720(e)).

There are carve-outs. Private residential projects built on private property are outside the chapter unless built under an agreement with a state agency, redevelopment or successor agency, or local housing authority. When a city requires a private developer to build a public improvement as a condition of approval, only that improvement work is covered. A public subsidy to an otherwise private project is de minimis, and does not make the project public works, if it is “less than six hundred thousand dollars ($600,000) and less than 2 percent of the total project cost”. Some affordable housing and shelter projects are excluded by 1720(c)(4) and (5). DIR issues formal coverage determinations on request.

The $1,000 figure is for the whole project, and DIR says the law does not let jobs be parceled out to stay under a threshold. The small project exemption only removes the registration, project notice and eCPR steps; the prevailing wage itself is still owed above $1,000.

Rates

The Director of DIR determines the general prevailing rate of per diem wages (Lab. Code 1770), and the awarding body must get those rates from the Director for each craft it needs (1773). In setting them the Director considers collective bargaining agreements and rates predetermined for federal public works in the locality; in practice, DIR says the rates are “usually based on rates specified in collective bargaining agreements”. Per diem wages include employer payments for health and welfare, pension, vacation, travel, subsistence and training (1773.1).

DIR publishes general determinations on its Director's General Prevailing Wage Determinations page; the current issue is 2026-2, with separate journeyman and apprentice menus. Under 8 CCR 16204, a determination takes effect 10 days after issuance, and “Any call for bids put out on or after the effective date of the determination must reflect that determination”. A single asterisk after the expiration date means the rate stays in effect for the life of the project; a double asterisk means increases are predetermined and must be paid for work after that date. The awarding body puts the rates in the call for bids and contract, or states that copies are on file, and posts the determination at each job site (1773.2).

Certified payroll (eCPR)

Every contractor and subcontractor keeps payroll records showing each worker's name, address, Social Security number, classification, daily and weekly straight time and overtime hours, and actual per diem wages paid, verified under penalty of perjury (Lab. Code 1776). Labor Code 1771.4 then requires each company to send those records directly to the Labor Commissioner, electronically, at least monthly, and defines monthly to mean “a submission of records shall be made at least once every 30 days while work is being performed on the project”, plus a final submission within 30 days after the last day of work. DIR calls weekly submission the best practice.

  1. The awarding body registers the project with DIR within 30 days of award and no later than the first day workers are on the job (Lab. Code 1773.3). That creates the DIR project ID.
  2. Each contractor and subcontractor creates an account on DIR's Public Works Website Services, links to its registered company and asks to join the project.
  3. Each company submits its own certified payroll records, by online entry or by XML upload using DIR's CPR XML schema V2, and marks the last one as the final eCPR.
  4. Corrections go in as a new record for the same pay period; the amended record takes precedence.

Filing with the prime, the awarding body or a union is not enough. In DIR's words, “Submitting certified payroll records to other agencies does not fulfill the requirement to submit certified payroll records to the Labor Commissioner/DIR.” The Labor Commissioner exempts projects monitored by four legacy labor compliance programs (Caltrans, City of Los Angeles, Los Angeles Unified School District and County of Sacramento) and projects under a qualifying project labor agreement. Submitted payrolls are public through DIR's CPR Public Search with personal details removed. To see how California compares with other states, use our certified payroll by state table and the due date tool.

Contractor registration and fees

No contractor or subcontractor may bid, be listed in a bid or work on a public works contract unless registered under Labor Code 1725.5 (section 1771.1). To register, a company needs workers' compensation coverage, a Contractors State License Board license where the trade requires one, no delinquent unpaid wage or penalty assessments, and no current federal or state debarment. DIR's registration page lists the fee as of November 2026: $400, $800 or $1,200 for one, two or three fiscal years (July 1 to June 30).

Working unregistered is costly. A first-time registrant who bid or worked on public works in the past 12 months pays a $2,000 penalty; an accidental lapse renewed by September 30 costs $400, a non-accidental one $2,000; two violations in 12 months can mean disqualification for up to 12 months. The Labor Commissioner may also assess $100 a day of unregistered work, up to $8,000, and a higher-tier contractor that hires an unregistered lower-tier sub faces $100 a day, up to $10,000 (1771.1(g), (h)). Check every sub on DIR's contractor search before you list it in a bid.

Apprentices

DIR says the apprenticeship duty under Labor Code 1777.5 applies on public works projects valued at $30,000 or more and, with few exceptions, to every contractor and sub on them, even one whose own part is smaller. The Division of Apprenticeship Standards (DAS) explains the steps. Within 10 days of the prime contract or subcontract, and no later than the first day workers are employed, send Contract Award Information (DAS 140) to the applicable apprenticeship committees. Then request dispatch of registered apprentices (DAS 142) from the programs in the area. At the end of the project, straight time apprentice hours must equal “1 hour for every 5 straight time journeyman hours for each separate craft”. Overtime hours do not count toward the ratio.

Only apprentices registered in a DAS-approved program may be paid the apprentice rate. Training fund contributions, listed on the wage determination, are due by the 15th of the month after the work. For the federal rules on the same topic, see Davis-Bacon apprentices and helpers.

Penalties, debarment and worker claims

The Labor Commissioner investigates, often after a complaint by a worker, a former worker or the public, and issues a civil wage and penalty assessment. It must be served within 18 months after the notice of completion is recorded or the work is accepted, whichever is later (1741), and the contractor has 60 days to ask for a hearing (1742). The main amounts:

ViolationPenaltySource
Paying less than the prevailing rateUp to $200 per worker per day, with floors of $40, $80 or $120 depending on good faith, prior record and willfulness, plus the wage differenceLab. Code 1775
Not furnishing eCPRs on time$100 a day, up to $5,000 per project, starting 14 days after the due dateLab. Code 1771.4
Not producing payroll records within 10 days of a written request$100 per worker per day until complianceLab. Code 1776(h)
Overtime violations$25 per worker per dayLab. Code 1813
Knowing apprenticeship violationsUp to $100 a day; up to $300 a day for a repeat within 3 yearsLab. Code 1777.7

On wage penalties, section 1775 sets the ceiling: contractors forfeit “not more than two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing wage rates”. A prime avoids a sub's penalties if it puts the required code sections in the subcontract, reviews the sub's payrolls, acts on underpayments and gets a sworn payment affidavit before final payment (1775(b)). Wages are another matter: “The contractor and subcontractor shall be jointly and severally liable for all amounts due pursuant to a final order under this chapter or a judgment thereon.”

Debarment under 1777.1 runs one to three years for violations with intent to defraud, up to three years for two or more willful violations within three years, and one to three years for failing to produce certified payrolls within 30 days of a written notice. The Labor Commissioner publishes the debarred contractor list. A joint labor-management committee may sue an employer for unpaid prevailing wages or missing payroll records within 18 months after completion or acceptance (1771.2). For how the federal side handles the same problems, see Davis-Bacon withholding and debarment.

Recent changes

DateChangeSource
May 24, 2024DIR's modernized Public Works Website Services: contractors without an account created since this date must create a new one; old PWC-100, PWCR and eCPR logins no longer workDIR registration page and FAQ
Jan. 1, 2025New section 1771.8 (SB 1303): conflict of interest and withholding rules for private labor compliance firms hired by awarding bodiesLab. Code 1771.8
Jan. 1, 2025Section 1743 (joint liability and payment bonds) amended by AB 2705Lab. Code 1743
Jan. 1, 2026Section 1773.1 amended by AB 889; it now revokes annualization exemptions the Director issued before Jan. 1, 2026Lab. Code 1773.1(f)
Jan. 1, 2026Section 1776 (payroll records) amended by AB 538Lab. Code 1776
July 1, 2026Registration statute as amended by AB 171 becomes operative: the Director may set fees up to $800 by posting them on DIR's site; a separate registration (1725.6) covers certain housing developmentsLab. Code 1725.5, 1725.6

Under 1773.1(e), benefit credit that is higher on public works than on private work is figured on an annual basis, with narrow exceptions. Our fringe benefits guide covers the federal version.

California law and Davis-Bacon on the same job

DIR draws the line by who controls the project. California law does not apply to projects awarded by and under the complete control of the federal government, and registration is not required for them. Federally funded or assisted projects run by a California awarding body, including most highway projects, are subject to state law: registration, project notice, eCPR, and “payment of California's prevailing wage rates, if they exceed corresponding Davis-Bacon rates”. In practice that means paying the higher of the two rates for each classification and keeping both sets of paperwork. The apprenticeship rules of 1777.5 do not apply to a federal project with no city, county or state money unless a state agency administers it. See which prevailing wage rules apply and Davis-Bacon coverage.

Questions filers ask

Is there a minimum project size for California prevailing wage?

Yes, but it is low. Labor Code 1771 applies to public works over $1,000, and jobs may not be split to avoid it. Between $1,000 and $25,000 (construction) or $15,000 (maintenance) you still pay prevailing wages but skip DIR registration, the project notice and eCPR.

How often do I file certified payroll with DIR?

At least once every 30 days while you work on the project and within 30 days after your last day, or more often if your contract says so (Lab. Code 1771.4). DIR recommends weekly. Penalties of $100 a day can start 14 days after a missed deadline.

I already send payrolls to the prime and a labor compliance program. Do I also file with DIR?

Yes. DIR says submitting to other parties does not satisfy the requirement to submit to the Labor Commissioner, unless the project falls under one of the four legacy LCPs or a qualifying project labor agreement.

Does a sole proprietor with no employees have to pay prevailing wage and file eCPRs?

Yes. DIR's FAQ says sole proprietors must pay themselves at least the prevailing rate and file eCPRs showing it.

What does DIR registration cost?

DIR lists $400 for one fiscal year, $800 for two or $1,200 for three, as of November 2026, with penalties of $400 or $2,000 for late or missed registration.