State prevailing wage laws

Prevailing wage for off-site fabrication, by state

Davis-Bacon covers work on the site of the work, so a permanent fabrication shop is usually outside it unless the shop becomes a secondary construction site building whole modules for the project. Several states go further and cover custom fabrication made off site for a specific public job: New Jersey and Delaware already do, Connecticut and New Mexico since July 2025, Oregon for contracts from July 1, 2026 and Pennsylvania from December 21, 2026, and Washington's L&I counts it as covered work. New York's 2026 amendment is suspended by a federal court order.

Updated November 21, 2026Sources 40 U.S.C. 3142(c); 29 CFR 5.2; ORS 279C.800 (Or. Laws 2025 ch. 612); Pa. Act 442 as amended by Act 101 of 2026; N.J.S.A. 34:11-56.26; 29 Del. C. 6960; N.Y. Labor Law 220(3)(f)

The federal baseline: the site of the work

The Davis-Bacon Act requires the contractor to pay “all mechanics and laborers employed directly on the site of the work”. The regulation, 29 CFR 5.229 CFR 5.2Code of Federal Regulations, eCFR, defines the site of the work in three parts: the primary construction site where the building or work will remain; any secondary construction site; and adjacent or virtually adjacent dedicated support sites such as job headquarters, tool yards and batch plants.

A secondary construction site is where a “significant portion of the building or work is constructed”, for specific use in that project, at a site set up for the contract or dedicated to it, exclusively or nearly so, for a specific period of time. A significant portion means entire modules, such as a completed room or structure, with little left but installation. DOL's 2023 rule FAQ says the definition “does not include offsite manufacturing of materials or prefabricated component parts”. And the regulation excludes permanent home offices, branch plants, fabrication plants and tool yards whose location and operation do not depend on a particular federal or federally assisted contract or project.

So on a federal job, a long-running sheet metal shop that builds duct for many customers is generally not part of the site, even for duct cut to this project's drawings. The 2023 rule also defined "material supplier"; the final judgment in AGC v. DOL, No. 5:23-cv-272-H (N.D. Tex.), Final Judgment, Doc. 108, June 24, 2026 vacated paragraph (2) of that definition, so only its first paragraph remains: delivery-only obligations, and a facility that is not on a primary or secondary construction site and either was set up before bids opened or is not dedicated, exclusively or nearly so, to the project. See laborers and mechanics and the 2023 rule in 2026.

State by state

From each state's statute or agency page, as of November 2026. States not listed had no off-site fabrication provision in the sources we read; that is not proof that none exists, so check the state page.

StateWhat off-site work is coveredWhich rateStatus
CaliforniaNo custom fabrication section in Labor Code articles 1 and 2. Covered: hauling refuse from the site and some on-hauling of paving, grading and fill (1720.3); hauling and delivery of ready-mixed concrete (1720.9)Ready-mixed concrete: the area where the plant is locatedIn force
ConnecticutCustom fabrication of mechanical systems in Connecticut for the projectProject town's rateEffective July 1, 2025
DelawareWorkers engaged in any custom fabrication work, wherever performedRates in the specificationsIn force (29 Del. C. 6960(b))
New JerseyCustom fabrication of plumbing, HVAC and duct systems, mechanical insulation or signs costing over $30,000 in total, and whole modules prefabricated for the project; not structural steel, precast concrete or smaller componentsNot stated separately in the definitionsIn force (P.L. 2004, c. 101)
New MexicoOff-site fabrication of HVAC and exhaust duct systems for the projectNot stated separatelyProcurements issued from July 1, 2025 (13-4-10.1(E))
New YorkCustom fabrication on site, off site or out of state for listed systems designed and engineered for the projectRate for the New York county where the project isSuspended by federal court order
OregonBespoke fabrication, assembly, preconstruction or construction performed offsite for a particular project, on listed systemsNot stated in the text we readContracts entered into from July 1, 2026 (BOLI FAQ)
PennsylvaniaCustom fabrication of nonstandard goods or materials made offsite for a public work project; not structural steel or precast concreteSame as project work for the tradeEffective Dec. 21, 2026
WashingtonL&I lists off-site work such as custom fabrication for the public works project as prevailing wage workCounty where the off-site work is performedL&I guidance
VirginiaDOLI follows the federal site of the work rule in 29 CFR 5.229 CFR 5.2Code of Federal Regulations, eCFRNot applicableDOLI FAQ
MontanaTransporting manufactured or fabricated items to or from the project is not subject to the standard prevailing rateNot applicableMCA 18-2-403(6)

Pennsylvania Act 101 of 2026

Act 101 (approved October 22, 2026) adds "custom fabrication" to the definition of public work. The new definition covers nonstandard goods and materials, including components, fixtures and parts, “that are fabricated or assembled offsite but produced specifically for a public work project”. The listed systems run from plumbing, HVAC, duct, boilers and electrical to welding, ornamental iron, rebar and signs, plus entire prefabricated modules. Structural steel members and precast concrete are excluded.

The "workman" definition now includes people employed to perform custom fabrication for the project, and the material supplier exclusion no longer applies when the work involves custom fabrication. Section 3 sets the rate: “The minimum wage for custom fabrication work shall be the same as the wage paid for project work in accordance with each applicable trade or classification.” A fabrication firm carries the same compliance, reporting, penalty and enforcement obligations as any other contractor or subcontractor. L&I's FAQ page, read November 21, 2026, still listed "Off-site work" among exclusions; L&I says it is assessing enforcement and compliance requirements for the Act. See the Pennsylvania page.

Oregon HB 2688

HB 2688 became Oregon Laws 2025 chapter 612. The legislature's summary says it “Applies the prevailing rate of wage to certain off-site bespoke work fabricated, preconstructed, assembled or constructed in accordance with specifications for a particular public works.” The amended ORS 279C.800 adds work that is bespoke, performed offsite, performed specifically for and to the specifications of a particular covered project, and performed on mechanical systems (HVAC, refrigeration, ducting and piping), plumbing, electrical systems, boilers, ornamental and structural iron, masonry and plaster, roofing, flashing and architectural panels other than glazing, or mechanical insulation. The ORS note says the amendments became operative July 1, 2026, and BOLI's FAQs (June 4, 2026) say “public works contracts entered into on or after this date are subject to HB 2688 related law changes”.

BOLI's older site-of-work guidance (a shop that runs before and after the contract is not part of the site) still sits next to its HB 2688 resources, so read both. BOLI also notes that Oregon's daily, weekend and holiday overtime rules apply to off-site work done to fulfill a contract with a public agency, even where the prevailing rate does not. See the Oregon page.

New Jersey and Delaware

New Jersey has covered custom fabrication since P.L. 2004, c. 101. Public work under N.J.S.A. 34:11-56.26 includes custom fabrication, and “contractors or subcontractors engaged in custom fabrication shall not be regarded as material suppliers”. The definition has two branches: fabrication of plumbing, heating, cooling, ventilation or exhaust duct systems, mechanical insulation or signs costing more than $30,000 in total; and any other fabrication of entire modules or structures prefabricated to a project's specifications with minimal construction left but installation. Structural steel, precast concrete and smaller prefabricated components are out. Other off-site manufacturing is covered only at the work-site, which includes a site set up for the contract (N.J.A.C. 12:60-2A.1). A contractor may not list an off-site custom fabrication subcontractor in a bid unless the sub is registered under the Public Works Contractor Registration Act when the bid goes in.

Delaware's statute is short and broad. Every contract must require the employer to pay laborers and mechanics employed directly upon the site of the work “or engaged in any custom fabrication work, regardless of where the work is performed”, weekly and at not less than the specified rates. The section covers public works over $500,000 for new construction or $45,000 for alteration and repair (as of November 2026). The text we read does not define custom fabrication. See the New Jersey and Delaware pages.

New York: enacted, then suspended

Labor Law 220(3)(f), as shown on the Senate's site, says custom fabricators are not material suppliers and that the prevailing rate for the county of the project applies to custom fabrication “regardless of whether the custom fabrication occurs on-site, off-site, or in another jurisdiction”. It lists wall panel systems, woodwork, electrical, plumbing, HVAC and duct systems, rebar cages and mechanical insulation engineered solely for the project, not stocked items. Fabricators would keep certified payrolls.

NYSDOL says the amendments, which were to take effect June 18, 2026, “are SUSPENDED by federal court order until further notice”, and that it is not enforcing them while the order is in place. Treat New York off-site work as uncovered for now, but watch the New York page for the outcome.

California: hauling and ready-mixed concrete, not fabrication

The California Labor Code public works articles we read have no custom fabrication section. Two sections reach off-site driving: 1720.3 (hauling refuse from the site, and on-hauling of paving, grading and fill integrated into the flow of construction) and 1720.9 (hauling and delivery of ready-mixed concrete). For ready-mix, the rate is the one for the area where the factory or batching plant is located (1720.9(d)), and the hauler files certified payroll with the party that engaged it and the general contractor within five working days after paying the driver. See the California page.

Washington, Connecticut and New Mexico

Washington. L&I's contractor page lists off-site work such as custom fabrication for the public works project among the work that requires prevailing wage, and sets the rate rule: “For off-site fabrication or work, use the county in which the off-site work is performed.” (Washington page)

Connecticut. Since July 1, 2025, 31-53(a) (P.A. 25-174, sec. 212) puts the wage clause in “each contract for off-site custom fabrication for any such public works project”: “the fabrication of mechanical systems that are fabricated at a site located within the state other than the location of a public works project”, not stock items, at the project town's rate (Connecticut page).

New Mexico. The project site now includes “any off-site fabrication locations that engage in the fabrication of heating, cooling, ventilation or exhaust duct systems” (NMSA 1978 13-4-10.1(E)).

When the job is also federal

State and federal definitions can differ on the same job. Oregon's rule for dual coverage is explicit: “For projects subject to both state and federal laws, BOLI will follow federal guidelines for the term” "site of work" (ORS 279C.838(2)). New York's suspended text excludes projects whose federal funding triggers federal wage rules, and section 15 of Pennsylvania's Prevailing Wage Act says it does not apply to public works subject to the Davis-Bacon Act. Elsewhere, ask the state agency. For the federal tests, see Davis-Bacon coverage and which rules apply.

What fabricators and primes should do

  1. List every item made off site for the job: made to this project's specifications, or stocked and sold to anyone?
  2. Check the state row above and the date. Pennsylvania's Act 101 takes effect Dec. 21, 2026, and L&I is still assessing how it will enforce it; Oregon covers public works contracts entered into on or after July 1, 2026.
  3. Put the prevailing wage terms in the purchase order or subcontract, and tell the fabricator which rate applies (project county or shop county).
  4. Collect certified payrolls from the fabricator like any other sub. In New Jersey, make sure the fabricator is registered before you list it in the bid.
  5. Check the fabricator's name and EIN against its W-9 before it starts work, and report payments on Form 1099-NEC where required (see tincompliance.com for 1099 and W-9 rules).
  6. On a job with federal money, apply the federal site rules too: a shop can be covered by the state but not by Davis-Bacon.

Questions filers ask

Is shop fabrication covered under Davis-Bacon?

Generally not, if the shop is a permanent facility whose location and operation do not depend on the project. It can be covered if it is a secondary construction site: a place set up for, or dedicated to, the project where entire modules such as completed rooms are built.

When does Pennsylvania's custom fabrication rule start?

L&I says Act 101 of 2026 goes into effect on December 21, 2026. Fabrication workers get the same rate as project work for their trade, and the fabricator has the same reporting duties as other subcontractors.

Which rate does an off-site fabricator pay in Washington?

L&I says to use the wage rates for the county where the off-site work is performed, not the job site county.

Is New York's custom fabrication law in effect?

No. NYSDOL says the 220(3)(f) amendments set for June 18, 2026 are suspended by federal court order and it is not enforcing them.

Does Oregon's HB 2688 cover structural steel?

The amended ORS 279C.800 lists ornamental and structural iron work among the systems. It must also be bespoke, done offsite and made for a particular covered project.

Are precast concrete and structural steel covered in New Jersey and Pennsylvania?

No. Both definitions exclude them.