Agency: CT DOL, Wage and Workplace Standards. Law: Conn. Gen. Stat. 31-53 and following, as of November 2026.
At a glance
Connecticut's thresholds are high, but once a job crosses them the rules are strict: union-based rates set town by town, a yearly July 1 rate update, monthly certified payrolls that are public records, and felony exposure for a false or missing payroll. The facts here come from chapter 557 of the General Statutes and the CT DOL Prevailing Wage Information page, both read on November 21, 2026. The July 1, 2025 amendments come from the Public Acts, as the codified text did not yet show them (see Recent changes).
| Item | Connecticut rule | Where it comes from |
|---|---|---|
| Who must pay | Contractors and subcontractors on public works of the state, political subdivisions and their agents | 31-53(a) |
| Threshold | $1,000,000 new construction; $100,000 remodeling, alteration or repair (as of November 2026) | 31-53(h) |
| Who sets rates | The Labor Commissioner, from collective bargaining agreements in the town | 31-53(d) |
| Rate updates | Each July 1 for the life of the contract | 31-55a; CT DOL page |
| Certified payroll | Monthly, to the contracting agency, with a signed statement | 31-53(f) |
| Safety training | Proof of OSHA 10 with the payroll for each worker's first week | 31-53b |
| Fine | $5,000 for each offense | 31-53(b) |
Which projects are covered
Section 31-53(a) requires a wage clause in each contract for the construction, remodeling, refinishing, refurbishing, rehabilitation, alteration or repair of any public works project by the state, a political subdivision, or an agent of either. The clause says wages and employee welfare fund payments “shall be at a rate equal to the rate customary or prevailing for the same work in the same trade or occupation in the town in which such public works project is being constructed”.
Section 212 of Public Act 25-174 amended 31-53(a) to cover each public works contract “including, on and after July 1, 2025, each contract for off-site custom fabrication for any such public works project”. The act defines off-site custom fabrication as “the fabrication of mechanical systems that are fabricated at a site located within the state other than the location of a public works project, but are fabricated specifically for such public works project”, such as plumbing, HVAC and duct systems. It “does not include components or materials that are stock shelf items or readily available”. See off-site fabrication by state.
Section 31-53(h) sets the floor. The law does not apply where the combined total cost or total bond authorization for all work by all contractors on “new construction of any public works project is less than one million dollars”, or where the combined cost of remodeling, refinishing, refurbishing, rehabilitation, alteration or “repair of any public works project is less than one hundred thousand dollars”. The test is the whole project, all contractors combined. Before award, the agency must certify to the Labor Commissioner the total dollar amount of work on the project, whether it is one contract or many (31-53(e)).
Other sections extend coverage:
| Section | What it covers |
|---|---|
| 31-54 | State highways and bridges on state highways; the Labor Commissioner sets the rates and the Commissioner of Transportation puts them in the contract |
| 31-53c | Construction projects of a business organization that gets Department of Economic and Community Development (DECD) financial assistance of $1 million or more; rewritten from July 1, 2025 by Public Act 25-168, section 146 (see below) |
| 31-53d | Renewable energy projects of 2 megawatts or more sited in the state and, from January 1, 2025, hydrogen projects, unless built under a qualifying project labor agreement |
DECD-assisted projects from July 1, 2025
Section 146 of Public Act 25-168 rewrote 31-53c. The $1 million assistance floor stays. A business organization now includes a “municipality, regional council of governments, Connecticut brownfield land bank or economic development agency”. The definition “excludes any organization that is exempt from taxation under Section 501(c)(3) of the Internal Revenue Code of 1986 or that is a chamber of commerce under Section 501(c)(6)”, on the condition that “such project is valued at not more than ten million dollars and is not for the purposes described in subsection (f) of this section”. New subsection (f) covers pollution cleanup, including by a 501(c)(3) nonprofit, but only “the remediation, demolition or abatement of pollution in buildings, soil or groundwater portion of the project”. Our reading, to confirm with CT DOL: a 501(c)(3) nonprofit or chamber is outside 31-53c on a non-cleanup DECD project of $10 million or less.
CT DOL will issue a determination letter on whether a project is covered. Its page asks you to email the project name, ownership, address, a narrative, the budget and an itemized list of funding sources to dol.prevailingwage@ct.gov.
Rates
The Labor Commissioner adopts the hourly rate and the welfare fund amounts, including health, pension, annuity and apprenticeship funds, set in collective bargaining agreements for the same work in the town (31-53(d)). Where more than one agreement covers a trade in the town, “the collective bargaining agreement of historical jurisdiction shall prevail”. Where no agreement covers the trade, the Commissioner uses federal Davis-Bacon determinations (see below).
The timing runs through the contracting agency. It must contact the Labor Commissioner at least 10 but not more than 20 days before the contract is advertised, and must put the rates for every classification in the bid proposal (31-53(e)). Once the contract is awarded, the contractor certifies under oath the pay scale it and its subcontractors will use. CT DOL posts Building, Heavy/Highway and Residential rate schedules for 2026 for information. For a project going out to bid, it says to get a bid package with the most up to date rates through its rate request form, because rates are subject to change throughout the year.
The July 1 update
Section 31-55a requires each contractor on a covered contract awarded on or after October 1, 2002 to contact the Labor Commissioner on or before July 1 each year for the life of the contract and adjust wages and fund payments effective each July 1. Section 147 of Public Act 25-168 extended it to DECD-assisted (31-53c) and renewable energy and hydrogen (31-53d) projects. CT DOL says that since July 1, 2025 “all prevailing wage projects are subject to the annual July 1 rate adjustment”. Post the rates at the site or where you pay your workers (31-55).
If you do not contribute to an employee welfare fund, pay each worker the fund amount as wages on each pay day (31-53(a)); compare Davis-Bacon fringe benefits.
Certified payroll
Section 31-53(f) requires each employer to keep wage, hour and classification records for every worker, on paper or electronically, and to submit them monthly. CT DOL's page sums it up: “Contractors must submit Certified Payrolls with a statement of compliance monthly to the contracting agency”. On a DECD project the payroll goes to DECD, and on a covered renewable or hydrogen project it goes to the developer. Mail, email or any method the recipient accepts will do.
The signed statement must say that:
- the records are correct;
- wages and welfare fund payments are not less than the prevailing rates and the contract rates;
- you complied with 31-53 and the related sections;
- each worker is covered by workers' compensation, with the carrier, policy number and dates listed;
- you take no kickbacks from any employee or welfare fund; and
- you know that filing a certified payroll you know to be false is a class D felony.
The felony warning is real: “filing a certified payroll which the employer knows to be false is a class D felony”, with a fine of up to $5,000, up to five years in prison, or both. Failing to file a certified payroll is also a class D felony. A general contractor may rely on a lower tier sub's certification, but not if it knows the certification is false. And there is no privacy: “the certified payroll shall be considered a public record” that anyone may inspect and copy. For filing rules across states, see certified payroll by state.
Registration, fees and training
We found no state contractor registration or registration fee for prevailing wage work in chapter 557 or on the CT DOL page (as of November 2026). Three entry steps apply instead:
| Step | Rule | Section |
|---|---|---|
| Pay scale oath | On award, certify under oath to the Labor Commissioner the pay scale you and your subs will use | 31-53(e) |
| Debarment affidavit | Every sub engaged by the general contractor swears it holds no interest of 10% or more in a debarred firm | 31-53a(b)(3) |
| OSHA 10 | Each worker has completed at least a 10-hour OSHA construction safety course (or an approved mine or telecom course); plumbers and electricians whose course is 5 or more years old need a 4-hour refresher | 31-53b(a) |
For safety training, the contractor must “furnish proof with the weekly certified payroll form for the first week each employee begins work on such project”. A worker without proof can be removed from the site if the documentation is not produced within 15 days (31-53b(b)). Commercial drivers who only deliver or pick up cargo, and public service company employees, are exempt (31-53b(d)).
Apprentices
The rate schedules include apprenticeship fund contributions as part of the welfare fund amounts the Commissioner adopts (31-53(d)). For covered renewable energy and hydrogen projects, each contractor and subcontractor must certify that it participates in an apprenticeship program registered with CT DOL or a federally recognized state apprenticeship agency, and the developer must take steps to set up a workforce development program (31-53d). The prevailing wage sections we read do not set apprentice ratios or apprentice pay percentages; check with CT DOL's apprenticeship office before using an apprentice rate. For the federal rules, see Davis-Bacon apprentices.
Penalties, debarment and worker claims
If the Commissioner believes a contractor knowingly or wilfully underpaid wages or fund payments, “such contractor or subcontractor shall be issued a citation and may be fined five thousand dollars for each offense” (31-53(b)). The contracting agency can also end the contractor's right to proceed and finish at the contractor's cost, or withhold payment, and must tell the Labor Commissioner within two days.
| Outcome | Rule | Section |
|---|---|---|
| Violators list | CT DOL keeps a list of contractors that violated 31-53 or settled a claim in the three preceding calendar years | 31-53(b) |
| May 1 review | Each May 1 the Commissioner reviews the rolling three years and may refer violators for debarment | 31-53(b) |
| Mandatory referral | Settlements totaling over $50,000 in back wages or fringe benefits, or over $50,000 in penalties, in the period | 31-53(b) |
| Debarment | No contract or subcontract for up to three years from publication of the list | 31-53a(b) |
| Working while debarred | Civil penalty of $1,000 for each day or part of a day | 31-53a(b)(4) |
| Highway jobs | Fine of up to $200 for each offense | 31-54 |
A debarred person or firm that keeps working on covered public work is liable for “a civil penalty of one thousand dollars for each day or part of a day”. Workers who are not made whole from withheld payments have a right of action against the contractor and its sureties, and it is no defense that they accepted less (31-53a(c)). A contractor that CT DOL makes pay for a sub's underpayment can sue that sub in Superior Court for the amount, costs and attorney's fees (31-53(g)).
Recent changes
| Date | Change | Source |
|---|---|---|
| July 1, 2025 | Off-site custom fabrication of mechanical systems covered (31-53(a)) | P.A. 25-174, secs. 211 and 212 |
| July 1, 2025 | DECD project rule (31-53c) rewritten; July 1 update extended to 31-53c and 31-53d projects | P.A. 25-168, secs. 146 and 147 |
| January 1, 2025 | Hydrogen projects added to the 31-53d covered projects (P.A. 23-156) | 31-53d text and history |
| July 1, 2023 | Fine set at $5,000 and the three-year violators list and May 1 review added (P.A. 22-17) | 31-53 history note |
Both acts were “Approved June 30, 2025”. Public Act 25-174 provided that “Section 148 of public act 25-168 is repealed” and re-enacted the fabrication rule with "mechanical systems" where 25-168 said "systems". Send project questions on the 2025 changes to dol.prevailingwage@ct.gov. See our off-site fabrication by state page and the state law changes log.
State law and Davis-Bacon on the same job
Connecticut ties its rates to federal ones in one place. For a trade with no collective bargaining agreement in the town, the Labor Commissioner “shall adopt and use such appropriate and applicable prevailing wage rate determinations as have been made by the Secretary of Labor of the United States under the provisions of the Davis-Bacon Act” (31-53(d)). The debarment list also includes firms barred from federal contracts under the Davis-Bacon Act (31-53a(a)). The saved sources do not say how to choose between state and federal schedules when both laws apply to the same contract; ask CT DOL and the federal funding agency. Start with which prevailing wage rules apply.
Questions filers ask
What is the Connecticut prevailing wage threshold?
The law applies to new construction when the combined cost of all work is $1,000,000 or more, and to remodeling, alteration or repair when it is $100,000 or more (as of November 2026).
How often is Connecticut certified payroll due?
Monthly, to the contracting agency (or DECD, or the developer of a covered renewable or hydrogen project), with a signed statement of compliance.
Do Connecticut rates change during my contract?
Yes. Contractors must check with the Labor Commissioner by July 1 each year and adjust wages and fund payments effective July 1. CT DOL says this applies to all prevailing wage projects since July 1, 2025.
What happens if I file a false certified payroll?
Knowingly filing a false certified payroll, or failing to file one, is a class D felony: a fine of up to $5,000, up to five years in prison, or both.
Do my workers need OSHA 10 on a Connecticut public job?
Yes. Send proof of at least 10 hours of OSHA construction safety training with the payroll for each worker's first week on the project.
Is off-site fabrication covered in Connecticut?
Yes, from July 1, 2025, for custom fabrication of mechanical systems (plumbing, HVAC, pipefitting, duct) made at a Connecticut site specifically for the project (P.A. 25-174, sec. 212). Stock shelf items are not covered.