Agency: DOLWD Wage and Hour. Rates stay fixed for the contract or 24 months, whichever is shorter. Law: AS 36.05 (Little Davis-Bacon), as of November 2026.
At a glance
Alaska's law is short and old, but it puts real paperwork on the contractor. Payroll goes straight to the state labor department, not to the agency that let the contract, and the prime contractor pays a filing fee on every contract on the job. DOLWD's Wage and Hour section runs the program. Its home page describes the goal plainly: “The Prevailing Wage program ensures that all contractors working on public construction projects pay the same costs for labor”. The facts below come from the Title 36 statute text on akleg.gov and the DOLWD pages, checked on November 21, 2026.
| Item | Alaska rule | Where it comes from |
|---|---|---|
| Who must pay | Contractors and subcontractors on public construction for the state, a political subdivision or a regional school board | AS 36.05.010; AS 36.95.010 |
| Dollar threshold | Contract over $25,000 (as of November 2026) | AS 36.05.005 |
| Who sets rates | DOLWD, published in Pamphlet 600 | AS 36.05.010 and 36.05.030 |
| Which rates apply | Latest issue at least 10 days before the final bid date; fixed for up to 24 months | AS 36.05.010 |
| Payroll | Sworn affidavit to DOLWD before the Friday of every second week | AS 36.05.040 |
| Filing fee | 1% of each contractor's contract price, total capped at $5,000 (as of November 2026) | AS 36.05.045 |
| Debarment | 3 years from the date the violators list is published | AS 36.05.090 |
Which projects are covered
The coverage rule is one sentence: “This chapter applies only to a public construction contract that exceeds $25,000.” Above that line, AS 36.05.010 says a contractor or subcontractor on a public construction contract “shall pay not less than the current prevailing rate of wages for work of a similar nature in the region in which the work is done”.
Title 36 defines "public construction" broadly. It means on-site field surveying, erection, rehabilitation, alteration, extension or repair, including painting or redecorating of buildings, highways or other improvements to real property, under contract for the state, a political subdivision of the state or a regional school board (AS 36.95.010(3)). "State or a political subdivision" includes any state department or agency, the state university, boroughs, cities, villages and school districts (AS 36.95.010(6)).
The workers covered are laborers, mechanics and field surveyors. The definition reaches physical or unskilled work, work with tools or machines that shapes materials into a structure or object, and outdoor surveying tasks (AS 36.95.010(2)). "Contractor" includes subcontractors performing work needed for the public construction (AS 36.95.010(1)).
Three more points decide close cases:
- How the contract was let does not matter. A cost-plus contract, or one signed without advertising for proposals, is still covered if it otherwise would be (AS 36.05.110).
- A subcontract can be broken down to a day labor basis to test whether the subcontractor paid at least the prevailing scale (AS 36.05.020).
- When the agency awards the contract it must tell DOLWD the amount, start date, contractor and every subcontractor, the site and a project description, and confirm bonding and contractor licensing (AS 36.05.035).
Rates
DOLWD has the authority to determine the prevailing wage and whether the chapter is being violated (AS 36.05.030). It publishes the rates as Pamphlet 600, "Laborers' and Mechanics' Minimum Rates of Pay." As of November 2026 the DOLWD page lists Issue 53, effective September 1, 2026, and Issue 52, effective April 1, 2026, with earlier issues archived.
Which issue applies depends on the bid date, not the start date. DOLWD says “To determine what Issue of Pamphlet 600 is applicable to a project it is necessary to know the final bid date of the project.” The statute sets the rule: the rate is the one in the latest determination issued at least 10 days before the final date for bids. Long jobs get a reset. “The rate shall remain in effect for the life of the contract or for 24 calendar months, whichever is shorter.” At the end of each 24-month period, if DOLWD has issued new rates, the latest ones apply for the next 24 months or until the job ends.
Title 36 defines wages so that the term “includes fringe benefits” (AS 36.95.010(7)). The contract must also require you to:
| Contract term | What it means for you | Section |
|---|---|---|
| Pay weekly | Pay all employees unconditionally and not less than once a week | AS 36.05.070(c)(1) |
| No side deals | Wages may not be lower than the advertised rates, whatever the contract between you and the worker | AS 36.05.070(c)(2) |
| Post the rates | Post the wage scale in a prominent, easily accessible place at the site | AS 36.05.070(c)(3) |
| Withholding | The state or political subdivision withholds enough of your payments to cover any underpayment | AS 36.05.070(c)(4) |
The advertised specifications must state the minimum wages for each class of laborer, mechanic or field surveyor and say that rates will be adjusted under AS 36.05.010 (AS 36.05.070(a)).
Certified payroll
Every contractor and subcontractor on a state or local public construction contract must, “before the Friday of every second week, file with the Department of Labor and Workforce Development a sworn affidavit for the previous reporting period”. The affidavit sets out the number of persons employed, wages paid, each employee's job classification, hours worked each day and week, and other information on DOLWD's form (AS 36.05.040).
- Before work starts, the prime contractor files the Notice of Work with DOLWD and pays the filing fees for every contractor on the job.
- Each contractor and subcontractor files its own sworn payroll with DOLWD before the Friday of every second week.
- When all work is done, the prime contractor files a Notice of Completion and pays any added fee from contract increases.
- Within 30 days after it receives the Notice of Completion, DOLWD tells the contracting agency how much, if anything, to withhold from final payment.
The payroll goes to DOLWD, not to the agency. That is different from the federal rule, where the contractor submits to the contracting agency (see Davis-Bacon certified payroll: who files). The DOLWD Wage and Hour page links to "Filing Certified Payrolls Online" and to DOT&PF AASHTOWare information, along with the prime contractor's and contracting agency's responsibilities and a Title 36 FAQ. For a side-by-side view of filing rules, see certified payroll by state.
Final payment is tied to DOLWD. An agency may release it to the extent DOLWD verifies that the notices and fees are in, that no investigation is open and that no violation notice has issued to any contractor on the job. The agency must also withhold from final payment enough to cover DOLWD's estimate of what employees of any contractor under investigation may be owed, plus any unpaid filing fees (AS 36.05.045(c)).
Registration, fees and training
Alaska has no separate prevailing wage registration, but the Notice of Work works like one, and it carries a fee. Before work starts the person who signed the contract names a primary contractor, and that primary contractor files the notice listing every contractor and the price paid to each. The primary contractor pays all the fees. “The filing fee shall be one percent of each contractor's contract price.” The total “may not exceed $5,000” (AS 36.05.045(a), as of November 2026).
On emergency work, the notice and fee may be filed after work begins, but no later than 14 days after (AS 36.05.045(d)). A false statement on a notice is punishable under AS 11.56.210 (AS 36.05.045(e)).
Contractor licensing is a separate duty. When it awards a contract, the agency must verify that the bonding rules of AS 36.25 and the licensing rules of AS 08.18 are met (AS 36.05.035(2)). DOLWD's Wage and Hour section also runs the Construction Contractor Licensing program. The statute text we read sets no safety training rule for public works.
Apprentices
Title 36's employment preference chapter has one line on apprentices: “Apprentices must be properly registered apprentices in their particular craft.” (AS 36.10.020). The sections we read do not set ratios or apprentice wage percentages; those come from the apprentice program and the Pamphlet 600 rates. Ask DOLWD before you use an apprentice rate. For the federal rules, see Davis-Bacon apprentices.
The same chapter adds an Alaska resident hiring preference on public works (AS 36.10). It is part of every public works contract (AS 36.10.080), and a contractor that violates it can have the prevailing wages that should have gone to a displaced resident deducted from its payments (AS 36.10.100(a)).
Penalties, debarment and worker claims
A violation is a crime. “A contractor who violates this chapter is guilty of a misdemeanor” and on conviction faces a fine of $100 to $1,000, 10 to 90 days in jail, or both, and each day counts as a separate offense (AS 36.05.060). The attorney general enforces the chapter when DOLWD asks (AS 36.05.030(b)).
| Tool | What happens | Section |
|---|---|---|
| Termination | The state or political subdivision may end your right to proceed with the work, or the part where wages were underpaid, and finish it; you and your sureties are liable for the excess cost | AS 36.05.080 |
| Direct payment | The disbursing or fiscal officer pays withheld money straight to the underpaid workers | AS 36.05.090(a) |
| Violators list | Names of persons who disregarded their obligations go to every state department and political subdivision | AS 36.05.090(b) |
| Debarment | A listed person, and any firm it has an interest in, is barred for three years | AS 36.05.090(b) |
| Worker action | Workers can sue the contractor and its sureties; accepting less is no defense | AS 36.05.090(b) |
The debarment rule says a listed person, and a firm in which that person has an interest, “may not work as a contractor or subcontractor on a public construction contract for the state or a political subdivision of the state until three years after the date of publication of the list”. DOLWD posts its list of debarred contractors on the Wage and Hour page.
If the withheld money is not enough, workers have the same right of action against the contractor and its sureties that the law gives to people who furnish labor or materials. It is no defense that the workers agreed to accept less or made refunds (AS 36.05.090(b)). Separately, the resident hire chapter lets a private person sue in superior court to enforce that chapter after giving the commissioner at least 20 days notice (AS 36.10.125(b)); that right is written for the employment preference rules, not the wage rules.
Recent changes
We found no 2024 to 2026 change to AS 36.05 in the sources we read. The akleg.gov text does not show amendment history, so ask DOLWD if you need to confirm. The rates change on a schedule instead: DOLWD issued Pamphlet 600 Issue 52 effective April 1, 2026 and Issue 53 effective September 1, 2026. If your bid date falls after September 1, 2026, Issue 53 or a later issue applies. Track statute changes across states on our state law changes page.
State law and Davis-Bacon on the same job
AS 36.05 does not say how its rates relate to federal Davis-Bacon rates when both apply, and the DOLWD pages we read do not either. The only federal funds rule we found in Title 36 is in the resident hire chapter: on a contract involving federal aid funds, that chapter may not be enforced in a way that conflicts with federal laws on veterans' preference or other preferences (AS 36.10.040). DOLWD's page links to the U.S. DOL Wage and Hour Division. If the job has federal money, read Davis-Bacon coverage and which prevailing wage rules apply, and ask DOLWD how the state filings work on that job.
Questions filers ask
What is the Alaska prevailing wage threshold?
AS 36.05 applies only to a public construction contract that exceeds $25,000 (as of November 2026).
How often do I file certified payroll in Alaska?
Every contractor and subcontractor files a sworn payroll affidavit with DOLWD before the Friday of every second week, covering the previous reporting period.
Who pays the Notice of Work fee, and how much is it?
The primary contractor pays for everyone on the job: 1% of each contractor's contract price, with a total cap of $5,000 (as of November 2026).
Which Pamphlet 600 issue applies to my job?
The latest issue DOLWD issued at least 10 days before the final bid date. It stays in effect for the life of the contract or 24 months, whichever is shorter, then updates if new rates have issued.
Can a contractor be barred from public work in Alaska?
Yes. A person on the violators list, and any firm in which that person has an interest, may not work on state or local public construction for three years from the date the list is published.
Does the prevailing wage include fringe benefits in Alaska?
Yes. Title 36 defines wages to include fringe benefits.