State law
Law
Prevailing wage law in force
Threshold
Over $60,000
Agency
New Mexico DWS
Certified payroll
Weekly records, sent to the contracting agency monthly
Partly confirmed on state sources
State prevailing wage laws

New Mexico prevailing wage law

New Mexico's Public Works Minimum Wage Act covers state and local public works contracts over $60,000. The Department of Workforce Solutions (DWS) sets the rates each year at the wage and fringe levels in local collective bargaining agreements and issues a wage rate decision for each project. Contractors keep certified payrolls updated weekly, send them to the contracting agency monthly, and must hold a valid LEF registration when bids are due.

Updated November 21, 2026Sources Public Works Minimum Wage Act, NMSA 1978 13-4-10 to 13-4-17 (NMOneSource, 2026); 11.1.2 NMAC; DWS Public Works page

At a glance

The working rules for New Mexico are in 11.1.2 NMAC, the Public Works Minimum Wage Act Policy Manual that DWS issues under NMSA 1978 sections 13-4-11 to 13-4-15. We read the rule on the State Records Center and Archives site, the DWS Public Works page, and the statute in the official compilation published by the New Mexico Compilation Commission on NMOneSource, all on November 21, 2026.

ItemNew Mexico ruleWhere it comes from
Who must payContractors, subcontractors and employers on state and local public works contracts11.1.2.2 and 11.1.2.8 NMAC
Dollar thresholdContracts or projects over $60,000 (as of November 2026)11.1.2.7(L), 11.1.2.8(A) NMAC
Who sets ratesThe DWS Labor Relations Division director, each year, at collectively bargained rates11.1.2.8(B), 11.1.2.9 NMAC
Rate typesA (street, highway, utility, light engineering), B (general building), C (residential), H (heavy engineering)11.1.2.10 NMAC; DWS page
Certified payrollUpdated weekly; to the contracting agency monthly; to DWS within 10 business days on request11.1.2.9 NMAC
RegistrationValid LEF registration when bids are due and for the project11.1.2.9(C)(7) NMAC
Underpayment$100 a day per affected worker if willful; treble unpaid wages if over $500 in total11.1.2.16(E) NMAC

Which projects are covered

The rule's preamble sets the scope: “Every contract or project in excess of $60,000 that the state or any political subdivision thereof is a party to for construction, alteration, demolition or repair”, or any combination of these, including painting and decorating, of public buildings, public works or public roads, that involves employing laborers or mechanics. Each such contract must state the minimum wages and fringe benefits for each class of worker and require that workers on the site be paid at least once a week, without unlawful deductions.

The statute, NMSA 1978 13-4-11(A), uses the same words and sets the same $60,000 floor. Two 2025 amendments widen it. First, the site of the project now includes “any off-site fabrication locations that engage in the fabrication of heating, cooling, ventilation or exhaust duct systems that are part of the public works project” (13-4-10.1(E)), for procurements issued on or after July 1, 2025; see off-site fabrication by state. Second, “For projects undertaken under the auspices of a municipality or county through the issuance of an industrial revenue bond”, contractors must pay the prevailing wage (13-4-11(J), effective June 20, 2025).

The definitions are broad. A "public work" is any facility for public use that is altered, built, demolished, installed, maintained or repaired and is funded in whole or in part with public funds or public financing, including a public grant and any form of tax bond financing. A "project" includes all contracts and employers involved in the coordinated work. The rule applies to all contractors, subcontractors, employers or any person acting as a contractor who employs laborers or mechanics on a public building, public works or public road project.

The contracting agency starts the process. Not less than three weeks before the first advertising date, it requests a wage rate decision from the director, describing the classifications of construction, the estimated cost of each and the site. The director sends the decision electronically within five business days. Within five business days after signing the contract, the agency files the notice of award and the subcontractor list with DWS electronically, and it reports later subcontractor changes within 10 business days.

Rates

New Mexico ties its rates to union agreements. The director sets prevailing wage and fringe rates “at the same wage rates and fringe benefit rates used in collective bargaining agreements between labor organizations and their signatory employers” that govern similar classes of workers in the locality and craft (11.1.2.8). A locality is one or more counties. Where a locality has no agreement to rely on, the director uses the rates from the nearest and most similar neighboring locality that has one (11.1.2.12).

  1. By May 31 each year, unions and signatory employers file their current collective bargaining agreements, with a list of wage, fringe and apprenticeship contribution rates by construction type. Others may file survey data and arguments by the same date.
  2. The director proposes rates, which go to a public hearing noticed at least 30 days ahead.
  3. Interested parties may appeal the adopted rates to the labor and industrial commission; the rates are not adopted for 15 days after issuance or while an appeal is pending.
  4. “The wage and fringe benefit rates are effective as of January 1 following adoption and publication.”
  5. Each project gets one wage and fringe rate decision that lasts for the duration of the project. A new decision replaces an earlier one only if the agency receives it at least 10 days before bids are due.

The statute fixes the calendar: “Annually, no later than October 1, the director shall determine prevailing wage rates and prevailing fringe benefit rates to take effect the next January 1” (13-4-11(B)). An appeal does not by itself stay them.

As of November 21, 2026, the DWS Public Works page posts 2026 Prevailing Wage and Fringe Benefit Rates for Types A, B, C and H, plus a schedule of subsistence, zone and incentive pay. Those extra payments are trade by trade: 11.1.2.21 NMAC sets the zones and daily amounts for each listed trade, and the certified payroll must show subsistence and zone pay when it applies. New Mexico's fringe definition is wide. It covers holidays, paid leave, bonuses, insurance, retirement contributions and zone, incentive and subsistence pay, when authorized through a negotiated process or a collective bargaining agreement; payments to an approved apprentice program are not fringe benefits. To read a rate sheet line by line, see how to read a wage determination.

Certified payroll and records

The contract must require the contractor and every tier of subcontractor to “maintain certified weekly payroll records that are to be updated weekly, provided to the contracting agency on a monthly basis”, and to the director on request. The prime contractor is responsible for getting every subcontractor's copies in. The rule does not require a particular payroll form, but payrolls must be numbered from 1 and must show:

Payroll itemDetail
WorkerFull name on the first payroll where the worker appears; classification or classifications
RatesHourly wage, hourly fringe, subsistence and zone pay when applicable, and overtime rate
HoursDaily and weekly hours in each classification, with actual overtime hours
PayItemized deductions and net wages paid
ProjectThe identifying number of the wage rate decision for the project
AttachmentsStatement of compliance, fringe benefit statement when applicable, and an annualization of fringe benefit worksheet

Other paperwork runs alongside the payrolls. Within 3 days of award, the contractor files a signed statement of intent to pay prevailing wages and fringe benefits. With the payrolls, each contractor gives a signed statement showing how fringe benefits were disbursed. Before final payment, the contractor and each subcontractor file a sworn affidavit of wages, fringe benefits and subsistence and zone payments. Contractors keep each worker's full Social Security number and current address and give them to the director on request for an investigation or audit. Records are kept for at least three years from final payment, and longer while disputes remain open. DWS lists the forms: Project Requirements, Intent to Pay Prevailing Wages, Affidavit of Wages Paid, Payroll Statement of Compliance and a Weekly Payroll Form. For other states' schedules, see certified payroll by state.

Registration, bonds and posting

New Mexico requires contractor registration. Each contractor and subcontractor must “Maintain a valid LEF registration at the time bids are due and for the duration of the project”, under NMSA 1978 section 13-4-13.1. Registration runs through DWS's online Public Works and Apprenticeship Application (PWAA), which DWS describes as handling “registering apprentices; issuing apprentice certifications; entering wage decision requests; completing public works paperwork; making apprenticeship contributions; and contractor registration/renewals”. Contractors and agencies create an administrator account first. The statute sets the fee: “The division shall charge a registration fee of four hundred dollars ($400) every two years.” An agency may not accept a bid from a prime contractor that cannot show its own registration (13-4-13.1(B)).

Registration can be lost. If a contractor does not answer the director's records request, the director may suspend the LEF registration and order funds withheld; the contractor then files a new registration and fee once it complies. The director may also cancel, revoke or suspend a registration for good cause, and frequent violations or a single substantive violation can be good cause. Contractors post the rates the director provides in a prominent, easily accessible place at each project site.

Apprentices

Apprentices on public works must be properly indentured, trained under registered apprenticeship standards and written agreements, and work only in their trade. Each apprentice is paid the rate set by the approved program. “Certification showing registration status of apprentices must accompany the first full payroll on which each apprentice first appears.” Rate sheets include an apprenticeship contribution, which the director fixes from the submitted bargaining agreements under the Public Works Apprentice and Training Act; DWS handles those contributions through the PWAA (Forms A and B).

A separate apprentice rule covers energy projects. DWS explains that under the Energy Transition Act, “construction of a facility that generates electricity or transmits electricity for New Mexico retail customers shall employ apprentices from a registered program” (NMSA 1978 62-13-16), and the general contractor submits a compliance plan to DWS after a funding award (11.2.3.29 NMAC). For the federal rules, see Davis-Bacon apprentices.

Penalties, debarment and worker claims

Workers and others can complain to the director. With reliable allegations showing probable cause, the director must start an investigation within 30 days of the complaint and decide within 75 days, with up to six more months for complex or multi-site cases. The contractor gets a chance to respond before the determination, and any party can ask for mediation. DWS posts a Public Works Wage Claim Form in English and Spanish.

OutcomeRuleSection
Records not produced or violation not fixedContracting agency withholds enough to pay the workers until compliance11.1.2.16(A) NMAC
Underpayment not voluntarily resolvedAgency terminates the contractor's right to proceed within 30 days; contractor and surety liable for excess costs11.1.2.16(B) NMAC
Willful failure to pay$100 to each affected worker for each calendar day11.1.2.16(E) NMAC
Aggregate underpayment over $500Three times the worker's unpaid wages or fringe benefits11.1.2.16(E) NMAC
Willful violatorName placed on a list sent to all state departments; registration action lasts three years unless promptly corrected11.1.2.16(D) NMAC

For a larger underpayment the contractor “shall be liable to any affected employee for three times the amount of the employee’s unpaid wages or fringe benefits”. On willful violations, “The cancellation, suspension, or revocation shall remain in effect for three years”, unless the contractor promptly corrects the problem and meets the director's conditions. The statute adds that the contracting agency pays affected workers, from withheld payments, “three times the amount of any wages or fringe benefits found due to the workers”, and that no contract goes to a listed willful violator until three years after the list is published (13-4-14(A)). In a worker's suit the court also awards attorney fees and costs (13-4-14(D)). The director gives at least 15 days' notice of contemplated action before final enforcement, and any interested party may appeal to the labor and industrial commission within 15 days. The rule says these procedures do not limit a worker's own right to pursue a claim for prevailing wages due.

Recent changes

Two statute changes took effect in 2025: off-site fabrication of heating, cooling, ventilation and exhaust duct systems became part of the site of the project (Laws 2025, ch. 126, for procurements issued on or after July 1, 2025), and industrial revenue bond projects of a municipality or county were brought under the prevailing wage (Laws 2025, ch. 132, effective June 20, 2025). In 11.1.2 NMAC, the history notes show no change after January 1, 2023 other than the yearly updates to the rate and subsistence tables (11.1.2.20 and 11.1.2.21), last made January 1, 2025. The rule text still prints the 2025 rate table, so use the DWS page or your project's wage rate decision for current numbers. See the state changes log.

State law and Davis-Bacon on the same job

The statute says only that the Act “shall not be construed to supersede or impair a more stringent requirement under any authority granted by federal law” to set wage rates (13-4-16). The rule and DWS page do not say how to choose between a state wage rate decision and a federal Davis-Bacon wage determination when both apply. The DWS page links to the federal Davis-Bacon program next to the state statutes and rules, and the rule's record-keeping section keeps other state or federal retention duties in place. If federal money is involved, start with Davis-Bacon coverage and which prevailing wage rules apply, and ask the DWS Public Works Office ((505) 841-4400, public.works@dws.nm.gov) before you bid.

Questions filers ask

What is the New Mexico prevailing wage threshold?

Contracts or projects over $60,000 that the state or a political subdivision is a party to (11.1.2.8 NMAC, as of November 2026).

How are New Mexico prevailing wage rates set?

The DWS director sets them each year at the wage and fringe rates in collective bargaining agreements for the locality and craft, after a public hearing. They take effect January 1.

How often do I send certified payroll?

Keep it updated weekly and give it to the contracting agency monthly. DWS can ask for it at any time and you have 10 business days to respond.

Do I need to register before bidding?

Yes. You need a valid LEF registration when bids are due and for the whole project. DWS handles registration and renewal in its PWAA online system.

What happens if I underpay on purpose?

You owe each affected worker $100 a day, treble damages if the total underpayment is over $500, and you can be listed as a willful violator for three years.

Sources