Section 45V pays up to $0.60 per kilogram of clean hydrogen (before inflation), depending on lifecycle emissions, for 10 years. Meeting the prevailing wage and apprenticeship rules multiplies that by five. After the 2025 budget law, construction must begin before January 1, 2028, and facilities that began before January 29, 2023 still owe prevailing wages on later repairs. This is general information, not tax advice.

Updated November 21, 2026Sources IRC 45V (as amended by P.L. 119-21, sec. 70511); IRC 45(b)(7) and (8); Treas. Reg. 1.45-7, 1.45-8 and 1.45-12; Instructions for Forms 7210 (2025) and 7220

What the credit is

Section 45V, the clean hydrogen production credit, pays for each kilogram of qualified clean hydrogen a taxpayer produces at a qualified clean hydrogen production facility during the 10-year period beginning on the date the facility was originally placed in service. Qualified clean hydrogen must come from a process with a lifecycle (well-to-gate) emissions rate of not greater than 4 kilograms of CO2e per kilogram of hydrogen, be produced in the United States in the ordinary course of business for sale or use, and have its production and sale or use verified by an unrelated party. No 45V credit is allowed for hydrogen from a facility that includes carbon capture equipment for which a 45Q credit has been allowed. Like the other clean energy credits, 45V uses the prevailing wage and apprenticeship (PWA) rules for its 5x amount.

Base amount vs increased amount

The base credit is “an amount equal to the applicable percentage of $0.60” per kilogram, adjusted for inflation, where the percentage depends on the emissions tier. The Form 7210 instructions for 2025 give the inflation adjusted base amounts, and state that “For 2025, the applicable amount ranges from $0.127 to $0.637 per kilogram”. The increase is a multiplier under 45V(e)(1): the credit “shall be equal to such amount (determined without regard to this sentence) multiplied by 5”.

Lifecycle emissions (kg CO2e per kg H2)Applicable percentage2025 base per kg (Form 7210 instructions)2025 with PWA (x5, our arithmetic)
Less than 0.45100%$0.637$3.185
0.45 to less than 1.533.4%$0.213$1.065
1.5 to less than 2.525%$0.159$0.795
2.5 to not greater than 4.020%$0.127$0.635

The IRS has not printed increased amounts in the instructions we read; the x5 column is our arithmetic from the published base. The 2026 amounts will appear in the 2026 Form 7210 instructions. 45V has no 1 MW exception.

Two ways to the 5x amount

45V(e)(2) is different from most PWA credits. An old facility does not simply escape the rules; it keeps a prevailing wage duty on repairs. The Form 7210 instructions list the two cases:

FacilityWhat it must do for 5x
Construction began before January 29, 2023“satisfies the prevailing wage requirements with respect to any alterations or repairs occurring after January 29, 2023”; no apprenticeship test
Construction began on or after January 29, 2023Meets both the prevailing wage requirements (construction, then alteration or repair during the 10-year period) and the apprenticeship requirements (construction)

The instructions say it plainly: “The apprenticeship requirements only apply to facilities for which construction began on or after January 29, 2023”. A modification that turns an existing plant into a clean hydrogen producer is treated under 45V(d)(4) as placing the facility in service when the modification property is placed in service, and Form 7220 is required for a modification that began on or after January 29, 2023.

2026 status after P.L. 119-21

Section 70511 of P.L. 119-21 moved the deadline. A qualified clean hydrogen production facility must be one “the construction of which begins before January 1, 2028” (it was January 1, 2033 before the 2025 law). The 10-year credit period still runs from the placed in service date, so a facility that starts construction in 2027 can earn credits well into the 2030s. The 2025 law did not change 45V's PWA paragraph.

ProjectStatus as of November 2026
Construction begins on or before December 31, 2027Can qualify; 5x needs PWA (or, if begun before January 29, 2023, PW on later repairs)
Construction begins January 1, 2028 or laterNot a qualified clean hydrogen production facility
Facility already in serviceCredits continue for the rest of the 10-year period; PW on alteration or repair each year to keep 5x

For developers this makes 2026 and 2027 the window to begin construction. How construction begins is measured with the Physical Work Test or the 5% safe harbor and the continuity rules (the Form 7220 instructions point to Notice 2022-61 for the methods), and the work that begins construction is itself covered construction work for PWA. See which credits carry the wage rules in 2026.

Which PWA rules apply

45V(e)(3) covers laborers and mechanics employed by the taxpayer or any contractor or subcontractor in “the construction of such facility”, and, in any tax year within the credit period, its alteration or repair. The Form 7210 instructions describe that period as “the 10-year period beginning on the date the facility is originally placed in service”. Correction and penalty rules similar to 45(b)(7)(B) apply, and apprenticeship rules similar to 45(b)(8).

Rule45V
Prevailing wage, constructionYes, for facilities that began on or after January 29, 2023
Prevailing wage, alteration or repairEach tax year of the 10-year credit period, for new and pre-2023 facilities claiming 5x
ApprenticeshipConstruction only, facilities that began on or after January 29, 2023
Cure for wage failuresBack pay plus interest, $5,000 per worker (see correction and penalties)
1 MW exceptionNone

Hydrogen plants mix trades: electricians and instrument fitters on electrolyzers, pipefitters on compression and storage, ironworkers and operators on site work. Each needs a classification on the wage determination, and missing classes go to DOL as additional classification requests (see supplemental wage determinations for IRA projects). After the plant starts up, electrolyzer stack replacements and other repairs are covered; routine maintenance is not. Keep the work orders that show which is which. For the apprentice share, see the apprenticeship requirement.

What to file

  1. Claim the credit on Form 7210, Clean Hydrogen Production Credit, and check the increased credit box in Part IV.
  2. The instructions say that if you claim the increased amount for meeting PWA, “you must complete and attach to your tax return Form 7220”.
  3. For a facility that began construction before January 29, 2023, attach the statement the Form 7210 instructions describe (continuity under the Physical Work Test or 5% safe harbor, and prevailing wages on alterations or repairs after January 29, 2023), and file Form 7220 for those alterations or repairs.
  4. Each later year of the 10-year period, file Form 7220 for alteration and repair work, or the signed no-alterations statement.
  5. Report any PWA penalties on Form 4255 and keep the records in Treas. Reg. 1.45-12.

The statute is at 26 U.S.C. 45V; the Form 7220 rules are on the Form 7220 page.

Questions filers ask

Is the 45V credit still available after the 2025 law?

Yes, for facilities whose construction begins before January 1, 2028. Facilities that begin later do not qualify.

Our hydrogen plant began construction in 2022. Do we owe prevailing wages?

Not on the original construction. To claim the 5x amount, the crews on alterations or repairs after January 29, 2023 must be paid prevailing wages during the 10-year credit period. No apprenticeship test applies to that facility.

How much is the 45V credit with PWA?

Five times the base. For 2025 the base ranged from $0.127 to $0.637 per kilogram by emissions tier, so the top tier with PWA is about $3.19 per kilogram by our arithmetic.

Does a small electrolyzer under 1 MW avoid PWA?

No. The 1 MW exception applies only to 45, 45Y, 48 and 48E.

Can we claim 45V and 45Q at the same plant?

Not for hydrogen produced at a facility that includes carbon capture equipment for which a 45Q credit is allowed for the year or any prior year.