Law
Prevailing wage law in force
Threshold
$50,000 or more (state funded)
Agency
Maine DOL
Certified payroll
Monthly to the public authority (statute); MDOL asks each pay period
State prevailing wage laws

Maine prevailing wage law

Maine requires prevailing wages on public works funded in whole or in part by state funds when the contract is $50,000 or more, and on certain state-assisted renewable energy projects. The Maine Department of Labor's Bureau of Labor Standards sets the rates once a year, contractors file payroll records with the public authority, and jobs under federal Davis-Bacon rates are exempt from the state law.

Updated November 21, 2026Sources 26 M.R.S. 1304 to 1317; Maine DOL Prevailing Wage Rates in Construction and Certified Payroll pages

At a glance

Maine's law sits in Title 26, chapter 15. It is narrower than many: it reaches only projects with state money or state assistance, and it steps aside when federal Davis-Bacon rates apply. Rates come from a yearly survey and are fixed for the life of the contract. MDOL's page states the reach: “Prevailing wage rates are the minimum rates contractors must pay on State-funded public works projects estimated to cost $50,000 or more.” We read the statute sections on legislature.maine.gov and the MDOL pages on November 21, 2026.

ItemMaine ruleWhere it comes from
Who must payContractors and subcontractors on state-funded public works and on assisted projects1305, 1306-A, 1309
Threshold$50,000 or more, funded in whole or part by state funds (as of November 2026)1304(8)
RatesBureau of Labor Standards, yearly, highest of three data sets1308
Rate lockUnchanged while the contract is in effect1306
PayrollRecord filed monthly with the public authority; MDOL asks for each payroll period1311; MDOL
Safety trainingOSHA 10 for all craft workers, with a monthly statement1317
Federal jobsState law does not apply where Davis-Bacon rates are set by the U.S. Secretary of Labor1314(1)

Which projects are covered

"Public works" includes public schools, buildings, roads, highways, bridges, sewers, waterworks, airports and all other structures upon which construction is “funded in whole or in part by state funds and for which the contract amounts to $50,000 or more” (1304(8)). "Construction" covers construction, reconstruction, demolition, improvement, enlargement, painting, decorating or repair let to contract, but not engineering or architectural services, temporary or emergency repairs or any contract of less than $10,000 (1304(2)). The public authority is any state officer, board, commission or agency that is authorized by law to contract for public works and is supported in whole or in part by state funds, plus the Maine Turnpike Authority (1304(7)).

MDOL's page adds how it reads "state funded." Covered projects are only those where the public authority, a state agency or a local government, got state funds specific to that project. “Excluded are projects where state funding is not dedicated to the project (i.e. Revenue Sharing funds).” Maintenance work and work done by state or local employees are also excluded.

Assisted renewable energy projects

Since January 1, 2023 the law also covers "assisted projects": renewable energy or energy production projects of 2 megawatts or more, with bids or proposals started on or after that date, where the State provides renewable energy credit certifications or other economic help such as power purchase payments, grants or loans (1304(1-A)). Contractors on these projects must pay all construction workers at least the prevailing rate (1306-A). Some projects approved by the Public Utilities Commission on or before June 29, 2021 and certain net energy billing projects are excluded. Federal clean energy credit rules are separate; see the clean energy section.

Rates

Before advertising for bids, the public authority must get the fair minimum rate of wages and benefits from the Director of the Bureau of Labor Standards and attach the schedule to the specifications and bid documents (1306). The Director must file it within 30 days of the request. Once in the contract, “the rate must remain unchanged during the time the contract is in effect”. No rate is set for a trade with fewer than 10 workers in the State in the survey period (1306).

Section 1308, amended in 2023, sets the method. The Bureau collects three data sets: a wage and benefit survey in the 2nd and 3rd week of July, certified payroll data from state public works for the same weeks, and the federal Davis-Bacon rates for the job classification. “The bureau shall use the highest wage and benefits information of the 3 data sets” to set the rate. A rate cannot drop too fast: if the new figure is lower than last year's, “the bureau shall adjust the rate to ensure that the decrease is not more than 15%”. Unions submit their latest agreement rates each year.

Rate category (2026)Note from MDOL
Building 2Other than one or two family homes; also used for Building 1 projects
Highway and EarthworkBy county
Heavy and BridgeBy county

On Building 1, MDOL says that since 2022 the Bureau no longer collects data from businesses in that subcategory, so use the Building 2 rates for those projects. "Benefits" covers health and welfare, pension or retirement account, vacation and annuity contributions, per diem in lieu of wages and other non-wage payments (1308(1)). Anyone affected by a determination can appeal to the Commissioner within 10 days after it is filed with the public authority (1308(3)). Employers asked to answer the survey must do so; the Director can fine up to $250 for a first refusal, $500 for a second and $1,000 for any later one (1308(1-A)). Post the rates in a prominent place at the site (1310).

Certified payroll

The statute requires each contractor and subcontractor to keep an accurate record of all laborers, workers and mechanics, and of all independent contractors working under them, with hours, job title, rate and pay. The record stays at the job site open to the Bureau and the public authority, and you need not keep it more than 3 years after the contract ends. “A copy of each such record must also be filed monthly with the public authority that let the contract”, or with the state agency giving help on an assisted project (1311).

MDOL's instructions ask for more frequent filing: “Certified payroll information must be submitted each payroll period by those companies required to pay State of Maine Prevailing Wage.” The copy goes to the general contractor and the letting agency with a signed Statement of Compliance, and MDOL says its Certified Payroll Form meets the requirement. The Bureau reviews the payrolls. If you file each pay period you meet both the statute's monthly rule and MDOL's instruction.

  1. Each pay period, send a copy of all payrolls with a signed Statement of Compliance to the general contractor and the letting agency, using the MDOL Certified Payroll Form.
  2. Include independent contractors working under you, not just employees.
  3. Keep a copy of the record at the job site, open to the Bureau and the public authority.
  4. Each month, also file the signed OSHA 10 statement of compliance with the public authority (1317).

Filed records are public records, but the public authority must adopt rules to protect Social Security numbers and taxpayer identification numbers in them (1311). For other states, see certified payroll by state.

Registration, fees and training

We found no prevailing wage contractor registration or fee in 26 M.R.S. 1304 to 1317 or on the MDOL pages (as of November 2026). The training rule is in 1317. All craft workers on the site must have completed a safety program that “uses a curriculum approved by the United States Department of Labor, Occupational Safety and Health Administration and is at least 10 hours in duration”. You file a signed statement of compliance with the public authority each month and post a signed affidavit at each job site.

Apprentices

Section 1314(2) limits the apprentice rate to real apprentices. You may pay the rate for registered apprentices in a classification “only if the worker is a participant in a registered apprenticeship program”, meaning a program registered under 29 CFR 29.329 CFR 29.3Code of Federal Regulations, eCFR with the U.S. DOL Office of Apprenticeship or a recognized state apprenticeship agency. On an assisted project, you must prove within 7 days of an MDOL request that your apprentices are in a registered program (1306-A(2)). The statute does not set a ratio. For the federal rules, see Davis-Bacon apprentices.

Penalties, debarment and worker claims

A contractor or subcontractor that willfully and knowingly violates the law “is subject to a forfeiture of not less than $250” (1312(1)). The same minimum applies to anyone who demands money from a worker as a condition of getting or keeping the job (1312(3)).

RemedyRuleSection
State forfeitureAt least $250 for a willful and knowing violation1312(1)
Worker recoveryThe unpaid difference, an equal penalty and reasonable attorney's fees; the surety is not liable for the penalty or fees1312(2)
KickbacksForfeiture of at least $2501312(3)
Assisted projectsMaterial breach of the assistance agreement: fines, ending or recouping assistance, or back pay to workers1312(4)

We found no debarment list in the sections we read. Workers paid less than the posted rate can recover the difference plus an equal amount as a penalty and attorney's fees from the contractor or subcontractor (1312(2)).

Recent changes

LawChangeSection
PL 2025, c. 476Latest amendment to the rate determination subsection; the current text uses the highest of the three data sets, caps decreases at 15% and defines benefits1308(1)
PL 2023, c. 333Amended the survey and payroll data paragraphs (now the 2nd and 3rd week of July) and added Davis-Bacon data as a third data set1308(1)
PL 2021, c. 705Assisted renewable energy projects covered for bids from January 1, 2023; Davis-Bacon exception and registered apprentice rule rewritten1304, 1306-A, 1314

The statute pages do not give the effective date of PL 2025, c. 476. Note one leftover: the definition in 1304(9) and the survey text in 1306 still refer to wages in September, while 1308 now sets the survey in July. MDOL posts 2026 rates and 2026 survey forms. See the state law changes log.

State law and Davis-Bacon on the same job

Maine is one of the few states that answers this question in its statute. When a public works project is built in whole or in part with federal funds, is under the Davis-Bacon Act or another federal act that has the U.S. Secretary of Labor set the wages, and those rates have been set, “sections 1304 to 1313 do not apply” (1314(1)). In that case follow the federal rules: Davis-Bacon coverage and federal certified payroll. Note that 1314(1) names sections 1304 to 1313, so the OSHA 10 rule in 1317 is not on that list. The Bureau may share wage data with U.S. DOL (1315), and Davis-Bacon rates are one of the three data sets behind Maine's own rates (1308).

Questions filers ask

What is the Maine prevailing wage threshold?

Public works funded in whole or in part by state funds with a contract of $50,000 or more (as of November 2026). MDOL counts only state funds dedicated to the project.

How often do I file certified payroll in Maine?

The statute requires the record to be filed monthly with the public authority. MDOL asks for certified payroll each payroll period, with a Statement of Compliance, to the general contractor and the letting agency.

Do Maine rates change during my contract?

No. Once the rate schedule is part of the contract, it stays unchanged while the contract is in effect.

Does Maine law apply on a Davis-Bacon job?

No. If federal funds are involved and Davis-Bacon rates set by the U.S. Secretary of Labor apply, sections 1304 to 1313 do not apply.

Can I pay an apprentice rate in Maine?

Only if the worker is in a registered apprenticeship program registered with U.S. DOL's Office of Apprenticeship or a recognized state apprenticeship agency.

Are solar and wind projects covered in Maine?

State-assisted renewable or energy projects of 2 megawatts or more, with bids started on or after January 1, 2023, are assisted projects that must pay prevailing rates.