- Form
- SF-1444, sent by the contracting officer
- Criteria
- Work not covered, used in the area, reasonable rate
- DOL timing
- Ruling within 30 days, or notice that more time is needed
- Pay from
- The first day of work in the classification
When to use it
Every class of laborer or mechanic on the job must have a rate. When one is missing, 29 CFR 5.5(a)(1)(iii)(A) requires the contracting officer to have it classified in conformance with the wage determination. The WH-347 instructions tell contractors to contact the contracting officer or agency representative right away when a worker's classification is missing. The contractor gathers the facts, the parties sign, and the agency sends the package to DOL. The background is in conformance: adding a missing classification. This template is a general starting point, not legal advice. Adapt it to your contract, your wage determination and any state law that also applies, and have counsel review it where the stakes are high.
The checklist
Template from prevailingwagerules.com, based on 29 CFR 5.5(a)(1)(iii); DOL Prevailing Wage Resource Book, Conformance Process; WH-347 instructions. Replace the highlighted text, check every line against your plan's facts, and delete this note before you use it.
Conformance Request Checklist (SF-1444)
Project: [Project name]
Prepared by: [Name, company] on [Date]
1. Is a conformance request needed?
☐ The work is not on the wage determination for this county and type of construction: [Describe the work]
☐ No classification on the wage determination performs this work in the area, as far as we can tell: [Notes]
☐ The request is not an attempt to split or subdivide a listed classification.
☐ The worker is not a registered apprentice (apprentices do not need a conformed rate).
☐ For welding: the welding is not incidental to a listed trade such as ironworker, plumber or sheet metal worker.
☐ For a helper: the duties are clearly defined and distinct, helpers are a prevailing practice in the area, and the helper is not an informal trainee.
2. Project facts (SF-1444 block numbers in brackets)
• Contract, project or HUD number (Block 5): [Number]
• Bid opening date, if advertised (Block 6): [Date]
• Contract award date (Block 7): [Date]
• Date contract work started, if started (Block 8): [Date]
• Prime contractor (Block 3): [Legal name]
• Subcontractor, if any (Block 10): [Legal name]
• Brief description of the project work (Block 11): [Description]
• Project location: city, county and state (Block 12): [Location]
• Wage determination number(s), modification number(s) and dates (Block 13): [WD, mod, date]
3. The proposed classification and rate
• Proposed classification (Block 13a): [Title]
• Duties, if other than a basic trade: [Description of duties]
• Proposed basic hourly rate (Block 13c): $[Rate]
• Proposed fringe benefits (Block 13c): $[Rate], or None
• Category used for comparison: [Skilled trades / Power equipment operators / Laborers / Truck drivers]
• Rates on the wage determination in that category: [List classifications and rates]
• Why the proposed rate bears a reasonable relationship to those rates: [Explanation]
• Union or weighted average rates in the category, by identifier on the wage determination: [Notes]
4. Agreement of the parties
☐ Prime contractor has signed (Block 14).
☐ Subcontractor has signed, if the sub will employ the workers (Block 15).
☐ Workers or their representative have signed, if known (Block 16), or the collective bargaining agreement is attached.
☐ Any party that disagrees has stated its views in writing, attached.
5. Send to the contracting officer
☐ Completed SF-1444 (or similar form or letter) sent to the contracting officer on: [Date]
☐ Copy of the contract wage determination(s) attached.
☐ Supporting documents attached: [List]
☐ Contracting officer confirms the agency signed and stated its recommendation, and emailed the package to DOL on: [Date]
6. While the request is pending
☐ Workers in the classification are paid at no less than the proposed rate, and the hours are tracked from day one: [First day of work in the classification]
☐ Payrolls show the work under the proposed classification with a note that a conformance request is pending.
☐ If no ruling after 30 days, the contracting officer has been asked to follow up with DOL on: [Date]
7. After the ruling
• Ruling date and result: [Approved / Modified / Disapproved]
• Approved classification, rate and fringe: [Classification, $ rate, $ fringe]
• Back pay owed from the first day of work in the classification, if the ruling is higher than what was paid: [Workers, amount, date paid]
☐ Ruling posted with the wage determination at the site, or a written copy given to each affected worker.
☐ Copy sent to every subcontractor that uses the classification.
The rules behind each section
Section 1, the criteria. All three must be met. The work “is not performed by a classification in the wage determination”; the classification “is used in the area by the construction industry”; and the proposed rate, with fringes, “bears a reasonable relationship to the wage rates contained in the wage determination”. The rule also says “The conformance process may not be used to split, subdivide, or otherwise avoid application of classifications listed in the wage determination.”
The Resource Book chapter adds three special cases. “Additional classifications and wage rates are not needed for bona fide apprentices” on Davis-Bacon contracts. Welders usually need no separate classification, because DOL treats welding as incidental to the trade doing the work (an ironworker or plumber, for example). Helpers are generally approved only when their duties are distinct and helpers are a prevailing practice in the area.
Sections 2 and 3, the SF-1444 items. The block numbers come from DOL's conformance checklist for contracting agencies. DOL also states that “WHD policy requires the submission of the contract wage determination with the conformance request.” For the rate, compare like with like: skilled trades to skilled trades, operators to operators, laborers to laborers, truck drivers to truck drivers. A rate DOL approved on another contract does not carry over: the chapter notes that “contractors may not rely on wage rates previously approved in response to similar conformance requests”. See how to read a wage determination for the union and weighted average identifiers.
Section 4, agreement. If the contractor, the workers (if known) and the contracting officer agree, the officer reports the action to DOL. If they do not, the officer refers the question with everyone's views and a recommendation. DOL's checklist warns that “No action will be taken on the request if the agency does not sign” and state its position.
Section 5 and 6, submission and waiting. The officer emails the request to DBAconformance@dol.gov. DOL will approve, modify or disapprove within 30 days or say it needs more time. “Lack of a DOL response within 30 days does not mean that the request has been approved.” Keep tracking hours in the classification from day one, because the result applies back to that day.
Section 7, the ruling. The conformed rate “must be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification”. Then “The contractor must furnish a written copy of such determination to each affected worker or it must be posted as a part of the wage determination.” Review and appeal routes are in 29 CFR 5.13 and part 7.
Clean energy facilities. For the IRS credits there is no contracting officer. The IRS FAQs say the taxpayer, contractor or subcontractor may ask DOL's Branch of Construction Wage Determinations directly (iraprevailingwage@dol.gov), and that “Any wage rate for an additional classification that is issued applies from the earlier of the date of issuance or the first day in which work in the additional classification was performed.” See supplemental wage determinations for the IRA credits.
Questions filers ask
Who files the SF-1444, the contractor or the agency?
The contractor prepares the information and signs, but the contracting officer sends the request to DOL with the agency's signature and recommendation. DOL takes no action without the agency's position.
How long does DOL take?
29 CFR 5.5(a)(1)(iii) says DOL will rule within 30 days of receipt or tell the contracting officer it needs more time. No answer in 30 days is not an approval.
Do we wait for approval before the workers start?
No rule makes the work wait, but the approved rate is owed from the first day of work in the classification. Track the hours and pay at least the proposed rate so any back pay is small.
Can we use a rate DOL approved for us on another job?
No. DOL's conformance chapter says contractors may not rely on rates previously approved in response to similar requests. Each rate must relate to the wage determination on this contract.
Do apprentices need a conformance request?
No. Apprentice rates are not on wage determinations. Registered apprentices are paid under their program, within the rules in 29 CFR 5.5(a)(4).