Pub. L. 119-21 moved end dates but not the PWA rules. Still open in 2026: 45Y, 48E, 45Q, 45V, 45Z, and 45U for existing nuclear plants. IRC 30C(i)IRC 30CInternal Revenue Code, Cornell LII, 45L(h), 179D(i), 45Y(d), 48E(e), 45V(c)(3)(C), 45Z(g), 45Q(d).
What the 2025 law changed, and what it did not
Public Law 119-21, signed July 4, 2025, ended or shortened many clean energy credits in its energy chapter (sections 70501 to 70522). Those sections do not mention prevailing wages or apprentices. The prevailing wage and apprenticeship rules (often shortened to PWA) in the Internal Revenue Code and in Treas. Reg. 1.45-6Treas. Reg. 1.45-6Treasury regulations, eCFR to 1.45-12 stand as they were. The IRS still describes the reward the same way: by meeting the requirements, “taxpayers can increase the base amounts of these incentives by 5 times”.
So the 2026 question is whether your project can still earn the credit, and how long the wage rules follow it after it is placed in service. Each status below carries its cutoff date and the section that sets it. Dates in this page were checked against the Code on November 21, 2026; the IRS may issue more guidance. This page is general information, not tax advice.
Status by credit, as of November 2026
| Credit | 2025 change (Pub. L. 119-21) | New work in 2026 | Wage rule after placed in service |
|---|---|---|---|
| 45Y and 48E, not wind or solar (storage, geothermal, hydro, nuclear and others) | Phase-down tied to 2032; foreign entity limits | Open. Full credit for construction that begins through 2033 (45Y(d), 48E(e)) | 45Y: 10-year credit period. 48E: 5 years, with recapture |
| 45Y and 48E, wind and solar | No credit if placed in service after Dec 31, 2027, for projects that begin after July 4, 2026 | Open if construction began by July 4, 2026, or if placed in service by Dec 31, 2027 | Same as above |
| 45 renewable electricity | No PWA change; already closed to new starts | Closed to construction beginning after Dec 31, 2024 (45(d)) | 10-year credit period |
| 48 energy credit | Rate for some property cut to 0% for construction from June 16, 2025 | Mostly closed (most property had to begin before Jan 1, 2025); geothermal heat pumps open for construction before Jan 1, 2035 | 5 years, with recapture |
| 45Q carbon capture | Utilization amount and foreign entity limits | Open: construction must begin before Jan 1, 2033 (45Q(d)) | 12-year credit period |
| 45V clean hydrogen | End moved from 2033 to 2028 | Open: construction must begin before Jan 1, 2028 (45V(c)(3)(C)) | 10-year credit period |
| 45Z clean fuel | Extended to fuel sold through Dec 31, 2029 | Open for fuel sold through 2029 (45Z(g)) | Yes (special rule for pre-2025 facilities) |
| 45U existing nuclear | Foreign entity limits | Open through tax years beginning by Dec 31, 2032 (45U(e)) | Prevailing wage on alteration or repair only |
| 30C refueling property | End moved to June 30, 2026 | Closed for property placed in service after June 30, 2026 (30C(i)) | None (construction only) |
| 45L new homes | End moved to June 30, 2026 | Closed for homes acquired after June 30, 2026 (45L(h)) | None (construction only) |
| 179D commercial buildings | End added: June 30, 2026 | Closed for property whose construction begins after June 30, 2026 (179D(i)) | None (installation only) |
| 48C advanced energy projects | Revoked amounts no longer go back into the program | Only projects already holding a certification | None (construction only) |
The alteration and repair column comes from the Form 7220 instructions and the Code. For 48 and 48E, the instructions say “The increased credit amount is subject to recapture during the 5-year period following the placed-in-service date if the prevailing wage requirement is not satisfied with respect to any alteration or repair during such period.” For 45U, the instructions say “There are no prevailing wage requirements during the construction of the facility.”
Wind and solar under 45Y and 48E
The 2025 law added a hard stop for wind and solar. New section 45Y(d)(4) reads: “This section shall not apply with respect to any applicable facility placed in service after December 31, 2027.” Section 48E(e)(4) says the same for the investment credit. But the stop only reaches projects that start late. Section 70512(l)(4) of the law says the change applies “to facilities the construction of which begins after the date which is 12 months after the date of enactment of this Act”, which is July 4, 2026.
That leaves two groups of wind and solar projects that can still earn the 5x bonus with PWA in 2026 and later:
- Projects whose construction began by July 4, 2026. The December 31, 2027 placed in service stop does not apply to them. Under the IRS continuity safe harbor, they may rely on continuity if the facility is placed in service no later than the end of the fourth calendar year after the year construction began.
- Projects whose construction began after July 4, 2026 that are placed in service by December 31, 2027.
How construction begins matters more than it used to. Notice 2025-42 (IRB 2025-36, September 2, 2025) says that for the July 4, 2026 deadline “the Physical Work Test described in section 3.02 of this notice is the sole method that a taxpayer may use for these purposes”. The old 5 percent cost safe harbor is gone for this purpose, except for solar facilities of 1.5 MW (AC) or less. The notice applies to wind and solar facilities whose construction did not begin before September 2, 2025. Physical work of a significant nature is a construction activity, so it is often done by contractors who are already on the prevailing wage clock: work on or after January 29, 2023 counts toward the PWA rules unless an exception applies (see the 5x bonus and its exceptions).
The 2025 law also bars 45Y and 48E for facilities whose construction begins after December 31, 2025 if the construction “includes any material assistance from a prohibited foreign entity”. That is not a wage rule; Notice 2026-15 gives interim safe harbors for it.
One more change worth knowing: for qualified fuel cell property that begins construction after December 31, 2025, new 48E(j) sets a flat 30 percent rate that “shall not be increased or otherwise adjusted by any other provision of this section”. We found no IRS guidance yet on how that reads with the PWA rules, so confirm with your tax adviser before you drop the wage rules on a fuel cell job.
The three June 30, 2026 cutoffs: 30C, 45L and 179D
Three credits that used PWA rules closed to new work in mid 2026:
| Credit | Code section | What it means |
|---|---|---|
| 30C alternative fuel vehicle refueling property | 30C(i): no credit for property placed in service after June 30, 2026 | Chargers and fueling property placed in service from July 1, 2026 earn no credit. |
| 45L new energy efficient homes | 45L(h): no credit for a home acquired after June 30, 2026 | The multifamily prevailing wage amounts apply only to homes acquired through June 30, 2026. |
| 179D energy efficient commercial buildings | 179D(i): no deduction for property whose construction begins after June 30, 2026 | A building whose construction began by June 30, 2026 can still qualify, even if placed in service later. |
For 179D, the IRS page (updated October 27, 2026) confirms: “The rules below continue to apply to property the construction of which begins on or before June 30, 2026.” Owners still claiming any of the three on a 2026 return for qualifying work must still document prevailing wages (and, for 30C and 179D, apprentices) for that work. See 179D and 45L.
Credits still open to new projects
45Y and 48E, other technologies. The phase-down is now tied to calendar year 2032 as the applicable year. Facilities whose construction begins in 2033 keep 100 percent of the credit, 2034 starts get 75 percent, 2035 starts get 50 percent, and later starts get nothing (45Y(d)(2), 48E(e)(2)). For 2026 the 45Y base amount is 0.6 cents per kilowatt hour and the increased amount is 3.1 cents, per the IRS notice of September 4, 2026: “the applicable amount provided in section 45Y(a)(2)(B) is 3.1 cents (or $0.031)”.
45Q carbon capture. Construction must begin before January 1, 2033 (45Q(d)). The prevailing wage rule follows alteration and repair through the 12-year credit period.
45V clean hydrogen. The 2025 law moved the start deadline up by five years: construction must begin before January 1, 2028 (45V(c)(3)(C)).
45Z clean fuel. Extended, not cut: the credit applies to fuel sold through December 31, 2029 (45Z(g)).
45U existing nuclear. The credit ends with tax years beginning after December 31, 2032 (45U(e)). Only the prevailing wage half applies, and only to alteration or repair.
48C. A certified project has 2 years from the date its certification is issued to be placed in service (48C(e)(3)(C)). The 2025 law changed 48C(e)(3)(C) so revoked certifications no longer free up credit for others. The 30 percent rate still needs PWA.
Older projects still under the wage rules
A closed credit does not end the wage rules for projects already in service. Section 45 is closed to new construction (the qualified facility definitions in 45(d) require construction to begin before January 1, 2025), yet a wind farm placed in service in 2024 that claimed the 5x amount must keep paying prevailing wages for any alteration or repair during its 10-year credit period. For 2026 the IRS set the 45 base credit at 0.6 cents per kilowatt hour for wind, closed-loop biomass, geothermal and solar facilities placed in service after December 31, 2021 (notice of June 1, 2026); PWA multiplies that by five.
The same holds for 48 projects inside their 5-year recapture window. A repair crew that is underpaid in year three can claw back part of the bonus. See fixing PWA failures and the correction and penalty estimator.
What this means for contractors and payroll staff
If you are an EPC contractor or subcontractor, the owner's credit choice decides your payroll rules. On a 2026 battery storage, geothermal or carbon capture job, expect the owner to require Davis-Bacon rates from the right wage determination, weekly payroll records, apprentice hours and requests to apprenticeship programs, because the owner “is solely responsible for ensuring that laborers and mechanics are paid wages not less than the prevailing rate whether employed directly by the taxpayer, a contractor, or a subcontractor”. On a commercial building that began after June 30, 2026, or a charger placed in service after that date, there is no federal tax reason for the wage rules, though a state law or a federal grant may still apply (see which rules apply).
The owner reports on Form 7220 and keeps the records the IRS expects, so it will ask you for them.
How to check your own project
- Find the credit section the owner will claim (45Y, 48E, 45Q and so on). The status table above gives the cutoff.
- Find the date construction began, and for wind or solar, whether it met the physical work test before July 5, 2026.
- Check whether an exception removes the wage rules: the under 1 MW exception (sections 45, 45Y, 48 and 48E only) or construction that began before January 29, 2023 (not every credit has it; check your section).
- If the wage rules apply, list the periods: construction, plus alteration and repair for 5, 10 or 12 years depending on the credit.
- Read the credit section and the IRS pages yourself, or ask the owner's tax adviser. The Code is at law.cornell.edu and the IRS overview is on its PWA page.
Questions filers ask
Did the One Big Beautiful Bill Act get rid of the prevailing wage rules?
No. The energy sections of Public Law 119-21 (70501 to 70522) changed end dates and added foreign entity limits but did not amend the prevailing wage or apprenticeship paragraphs. Projects that can still earn a credit still need PWA for the 5x amount.
Can a solar project that starts construction in 2026 still get 30 percent?
Yes, if construction began by July 4, 2026 under the physical work test, or if it is placed in service by December 31, 2027. In either case it needs PWA (or the 1 MW exception) for the 30 percent rate under 48E.
Is 179D dead for a building we start in 2027?
Yes. 179D(i) says the section does not apply to property whose construction begins after June 30, 2026.
Do we still pay prevailing wages on repairs to a 2024 wind farm?
If the owner claimed the 5x amount under section 45, yes: prevailing wages apply to alteration and repair work in any year of the 10-year credit period. Routine maintenance is not covered.
Which credits never had an apprenticeship rule?
45L and 45U. Only the prevailing wage half applies to them.
Where can I check for newer IRS guidance?
The IRS prevailing wage and apprenticeship page lists the guidance; it was last updated July 2, 2026 when we checked. Treasury and the IRS may still issue rules under the 2025 law.